1.1 Introduction
In this section, Analysis of Railway Construction Cost Overruns and Mitigation Measures is discussed, with relevant and recent citations. As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the aim and objectives of the study. Others are significance of the study, scope of work, research hypothesis and questions, limitation of the study and definition of terms.
1.4 Aim and Objectives of the Study
The study seeks to analyze the Railway Construction Cost Overruns and Mitigation Measures. To achieve this aim, the study has the following objectives:
⋮