This page presents an excerpt of the available research material, including the Preliminary Pages, Table of Contents, Abstract, Chapters One to Five, and References. It provides a comprehensive overview of the study, enhancing readability and accessibility for students, and researchers seeking complete material on “Appraisal of Stakeholder Management Practice in Tertiary Education Trust Fund (tetfund) Construction Projects”.
I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Management and Education for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Appraisal of Stakeholder Management Practice in Tertiary Education Trust Fund (tetfund) Construction Projects provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.
PRELIMINARY PAGES
CHAPTER ONE
INTRODUCTION
CHAPTER TWO
LITERATURE REVIEW
- 2.1 Introduction
- 2.2 Conceptual Review
- 2.3 Theoretical Framework
- ⋮
- 2.4 Empirical Studies
- 2.5 Research Gaps
- 2.6 Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
- 3.1 Introduction
- 3.2 Research Design
- 3.3 Population of Study
- 3.4 Sampling and Sampling Technique
- 3.5 Validation of Research Instrument
- 3.6 Method of Data Collection
- 3.7 Method of Data Analysis
- 3.8 Questionnaire Administration
- 3.9 Ethical Consideration
- 3.10 Statistical Analysis
CHAPTER FOUR
DATA ANALYSIS, RESULT AND DISCUSSION
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Re-statement of Research Questions
- 4.4 Test of Hypotheses
- 4.5 Discussion of Findings
CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION
- 5.1 Introduction
- 5.2 Summary of Findings
- 5.3 Conclusion
- 5.4 Recommendation
- 5.5 Suggestion for Further Study
REFERENCES
APPENDIX A - “QUESTIONNAIRE”
Several researchers have identified the importance of managing stakeholders as major criteria for determining project success. Project success has now extended beyond completing projects within budgets, schedule and set standards as traditionally viewed. Satisfying key stakeholders is another criteria used in evaluating project success, thus stakeholder management is an important aspect of project management. In Nigeria, studies conducted in the research area have not assessed the adoption of stakeholder management.
Therefore, this study appraises the concept in TETFUND construction projects. Interviews were conducted with project managers that have managed TETFUND construction projects in higher institutions. Comparative content analysis was used for analysing the interview responses. The results show the level of awareness and application of the concept within the firms; communication identified as the major tool for managing project stakeholders; and the major barriers encountered in managing stakeholders
Despite the awareness and acknowledgements of the importance of managing stakeholders, there is no proper adoption of the guidelines for stakeholder management as stated in literature. The study recommends that proper adoption of stakeholder analysis and engagement steps should be embraced by consulting project management firms in managing project stakeholders.
Several researchers have identified the importance of managing stakeholders as major criteria for determining project success. Project success has now extended beyond completing projects within budgets, schedule and set standards as traditionally viewed. Satisfying key stakeholders is another criteria used in evaluating project success, thus stakeholder management is an important aspect of project management. In Nigeria, studies conducted in the research area have not assessed the adoption of stakeholder management.
Therefore, this study appraises the concept in TETFUND construction projects. Interviews were conducted with project managers that have managed TETFUND construction projects in higher institutions. Comparative content analysis was used for analysing the interview responses. The results show the level of awareness and application of the concept within the firms; communication identified as the major tool for managing project stakeholders; and the major barriers encountered in managing stakeholders
Despite the awareness and acknowledgements of the importance of managing stakeholders, there is no proper adoption of the guidelines for stakeholder management as stated in literature. The study recommends that proper adoption of stakeholder analysis and engagement steps should be embraced by consulting project management firms in managing project stakeholders.
…
This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …
How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)
Above is a preview excerpt of the full study on “Appraisal of Stakeholder Management Practice in Tertiary Education Trust Fund (tetfund) Construction Projects”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!
Seminar Material ₦3,000 | | Project Material ₦5,000 |
To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.
| ACCT NAME | SPARKLYN SERVICES |
| Zenith Bank PLC | 1222599051 |
| MoniePoint (MFB) | 8030511988 |
| Paycom (OPay) | 8030511988 |
–– or ––
For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.
After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.
Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.