Project Topics Seminar Topics Post UTME Nursing Exam Past Questions
Search Topic
PARKLYN
ERVICES
· RC: 2994849
Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage

Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Quantity Surveying (QS) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies
    • 2.5 Research Gaps
    • 2.6 Summary of Literature Review

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”



    ABSTRACT

    This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effective realization of construction projects This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contractors for better estimating. 84 questionnaires were sent out, 28 to con tractors, 28 to clients, and 28 were sent to the consultant firms respectively. 25 questionnaires were received from each of the respondent categories, representing 89% using the simple random sampling technique.

    The collected data were analyzed using the Relative importance Index. The study found out that a statistically significant relationship existed between the clients, consultants, and contractor on the essential factors affecting accuracy of pre-tender cost estimate. It was concluded that: Experience and skill level of the consultants ranked with overall Ru of 0.9, project teams experience on the construction type 0.87, clear and detail drawings and specification, completeness of cost information, accuracy and reliability of cost information are the most significant factors affecting accuracy of pre-tender cost estimate were other paramount factors.

    The most appropriate cost estimating method at the design stage according to the respondents ranking is subjective estimating with Ru of 0.78 and parametric estimating 0.46 and synthetic estimating 0.52. It was recommended that Clients should always engage the services of skilled quantity surveyors to undertake the consultancy services in cost estimating process.



    Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage


    1.0 Introduction

    1.1 Background of the Study

    Construction estimate is the amount envisages to finish a construction work. It is the probable amount that is computed to complete a construction work. It is the prediction of the amount of a project based on available data at the time of prediction.

    Cost estimate was defined by business dictionary (2013) as an “approximation of the probable cost of a product, program, or project, computed on the basis of available information. So the more information is provided on a project, the more the estimate tends to accuracy. It is important in many ways. According to business dictionary (2013), “four common types of cost estimates are: Planning estimate is a rough approximation of cost within a reasonable range of values, prepared for information purposes only, budget estimate an approximation based on well-defined ground rules, firm estimate a figure based on cost data that is renewable enough for entering into a binding concrete, not-to- exceed/Not-less-than estimate the maximum or minimum amount required to accomplish a given task, based on firm cost estimate. There are more benefits in estimating the cost of a potential construction Job that is not estimating before commencement. Cost estimate, to a client, is necessary in cash flow management.

    To an investor, it is necessary to support evaluation of project feasibility and to assess the scope of work. To a consultant, construction cost estimate can serve as a basis for job performance measurement (Baccarini 2004), in contract or selection, as an exhibit in construction contract disagreement, and in post work evaluation of completed jobs (work audit), and to a contractor, it is the determinant ofjob procurement (in bidding for construction jobs).


    1.2 Statement of the Problem

    The demand for more construction of all type coupled with tight monetary supply has provided the construction industry with, a big challenge on how to estimate the cost of construction project.

    The problem of late involvement of quantity surveyor, inadequate details in the contract document, poor communication between the design team, inaccurate drawing and specification, inadequate data, unavailability of current rates of construction resources, inflation and charming in technology, finally consequent loss of project has brought about loss of client confidence in consultants, added investment risk, inability to deliver value to clients and disinvestment in the construction industry. As a result of this, it is found necessary to create solution to such problems through this research as to improve on the quality of the factors that affect the preparation of the cost estimate at the design stage.


    1.3 Aim and Objectives of the Study


    1.3.1 Aim

    The aim of this research is to assess the factors that mitigate the effective preparation of cost estimate at the design stage.


    1.3.2 Objectives

    1. To achieve the above stated aim the following specific objectives shall be pursued:
    2. To identify the factors that mitigates the effective preparation of cost estimate at the design stage.
    3. To determine the appropriate method of cost estimating at the design stage
    4. To access the factors that mitigates the effective preparation of cost estimate at the design stage.

    1.4 Significance of the Study

    The significance of this research is to promote good estimating to sustained profit as errors and carelessness can be costly in terms of loss of profit and project abandonment.


    1.5 Scope of the Study

    This research focused on the cost estimate at the design stage of public building project within Federal Capital Territory Abuja.


    1.6 Limitation of the Study

    In this process of this research project, there were various forms of setbacks which had a great effect on the process of this research project.

    One of such set back is the inability to get the appropriate and reliable information and it book found from librarian visited, also the high cost of transportation to the various information centers visited and place where the questionnaire where given out, as well the reluctance shown by these whom the questionnaires were given to.

    Despite all this, a reasonable amount t of work was achieved based on the research topic.


    CHAPTER TWO

    2.0 Literature Review

    2.1 Introduction

    This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

    Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

    Above is a preview excerpt of the full study on “Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage”. The complete material, including all five chapters, is available for download upon request.


    To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


    Seminar Material
    ₦3,000
    Project Material
    ₦5,000

    For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


    Account Details - For USSD / POS Transfer

    ACCT NAMESPARKLYN SERVICES
    Zenith Bank PLC1222599051
    MoniePoint (MFB)8030511988
    Paycom (OPay)8030511988

    –– or ––



    After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


    Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




    You can get more research topics on Quantity Surveying, if you did not see your preferred topic from the alternate list above.

    Defense Procedure for Quantity Surveying Researchers


    In preparation for defending a project or seminar on Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


    Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


    Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


    During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.


    Page Content Headings - Assessment of the Factors Mitigating the Effective Preparation of Cost Estimate At the Design Stage

      Download Material (Docx)