Comparisons of Procurement Characteristics of Traditional and Labour-only Procurements in Housing Projects in Nigeria

WhatsApp Channel

Comparisons of Procurement Characteristics of Traditional and Labour-only Procurements in Housing Projects in Nigeria


This page presents an excerpt of the available research material, including the Preliminary Pages, Table of Contents, Abstract, Chapters One to Five, and References. It provides a comprehensive overview of the study, enhancing readability and accessibility for students, and researchers seeking complete material on “Comparisons of Procurement Characteristics of Traditional and Labour-only Procurements in Housing Projects in Nigeria”.


ACKNOWLEDGEMENT


I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Building Technology (BT) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Comparisons of Procurement Characteristics of Traditional and Labour-only Procurements in Housing Projects in Nigeria provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




ABSTRACT


Procurement characteristics of Traditional and Labour-only are compared in some selected states of Nigeria. The objective of this study is to examine if procurement risks, generation of claims, variations to original design, control of sub-contractors and procurement prospects are the same for both methods. The study obtains its primary data through the use of designed questionnaires that are sent to clients, contractors and consultants. In all, 120 questionnaires were sent to these respondents who recently completed their housing projects based on the two methods. Results of the study indicate that there is no significant difference between both methods in terms of risks of value for money, getting good satisfaction, generation of more claims and variation to original design while a significant difference exists between both methods in risk of timely completion of project.

Labour-only method demonstrates less risk of timely completion of project than the Traditional method. Characteristics of both methods are not significantly different from each other when control of subcontractors, benefits of getting good quality material and workmanship, satisfaction with co-ordination and planning. improved relationship between project team and timely delivery of project are benefits of comparisons. Labour-only differs significantly from Traditional method in terms of prospect of getting good value for money spent on the project. This study concludes that there are various types of risks inherent in use of both methods in housing projects and Labour-only method indicates characteristics of early completion of project and prospects of getting good value for money.

Recommendations of the study are that clients, contractors and consultants should use Labour-only for execution of their future housing projects and also they are at liberty to use any of the two methods as they best satisfy their requirements. Implications of this study to policy makers and other stakeholders in the construction industry is that Labour-only method should be explored for use in large and complex projects as significant cost savings can be achieved, timely delivery of project and good value for money are equally achievable with the use of the method. Results of this study serve as a springboard for further research in perfecting the use of Labour-only method for construction projects.




1.1 Introduction

… As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Research hypothesis and questions, Limitation of the study and Definition of technical terms.…


CHAPTER TWO

LITERATURE REVIEW


2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …


How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)


Above is a preview excerpt of the full study on “Comparisons of Procurement Characteristics of Traditional and Labour-only Procurements in Housing Projects in Nigeria”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!