Project Topics Seminar Topics School of Nursing Exam PDF Sign Up
Search Topic
PARKLYN
ERVICES
· RC: 2994849
Construction of an Automatic Change-over Switch with Indicator That Will Switch Load from the Mains Phcn Power Supply with Simplicity

WhatsApp Channel

Construction of an Automatic Change-over Switch with Indicator That Will Switch Load from the Mains Phcn Power Supply with Simplicity


This page presents an excerpt of the available research material, including the Preliminary Pages, Table of Contents, Abstract, Chapters One to Five, and References. It provides a comprehensive overview of the study, enhancing readability and accessibility for students, and researchers seeking complete material on “Construction of an Automatic Change-over Switch with Indicator That Will Switch Load from the Mains Phcn Power Supply with Simplicity”.


ACKNOWLEDGEMENT


I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Electrical / Electronics Engineering (EE) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Construction of an Automatic Change-over Switch with Indicator That Will Switch Load from the Mains Phcn Power Supply with Simplicity provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.





1.0 Introduction

Industrial automation and control has contributed immensely to the high rate of the world's technological growth. Power control and automation is a part of this field which is applied in virtually anywhere electrical power is used, generated or transmitted. Manual power change-over switches have been in existence and in different forms and shapes. 1959, the advent of microelectronics has paved way to modify the manually operated change-over switches. This project deals with the design and construction of automatic change-over switch with indicator. It eliminates the time and energy spent in operating the manual change – over and starting of Gen. Set. It is fully automated. It can be used in residential houses, offices and most importantly, in factories that required constant power supply. It has so many advantages over the existing ones/types.


1.1. Background Of The Study

This project work is embarked upon to eliminate nearly every shortcomings associated with the manually operated type to ensuring that it is fully automated.

This system is realized in several functional blocks all combined to form one functional system. The first block is a 3-phase MAINS regulated dc power supply unit that powers the overall circuit and acts as the input. The output of thin block is fed into a priority encoder (74147) which selects the most prioritized phase at a time. The third block is a BCD – to – DECIMAL Decoder (7442) used to decode the prioritized phase.

The fourth is the driver stage which comprises of NPN transistor that energizes the electromagnetic relay which switches the phase in priority. The Gen set switching section is achieved using the least prioritized phase. This section switches ON the Gen set when all the NEPA phases are low, OFF or faulty. Once the Gen set phase is selected, a switching transistor fires an SCR which conducts large battering current to the ignition coil of the Gen set. Panel indicators are used to show the status of the system.


1.2. Aims And Objectives Of The Project

The aims and objectives of this project is to:

  1. Design and construct an automatic change-over switch with indicator that will switch load from the mains power supply (PHCN) power supply (Generator) with simplicity.
  2. To introduce a circuitry that will sense power outage and at the same time sense fluctuation in the power supplied to the load at any point time.

1.3. Significance Of The Project

This project eliminates the stress, time delay and other drawbacks in manually operated types. The project is modified to display the phase in use at a particular time using a single seven segment Display and its appropriate circuitry.


1.4. Scope Of The Study

This project work was carried out primarily with the aim of solving the problem of manual change-over switch when there is need for changing to generator due to power failure from public power supply.
Also, the essence of this project work is to design and construct a 90A, 220V, 50Hz automatic change-over switch which will serve as a standby switch to generator when there is power outage.


1.5. Limitations Of The Project

Due to the principal operation of the device, it cannot switch two voltage supply once, during operation. So the power switching of the supplies depends on the state in which the device is, that means it can only be in an on or off state, so as to avoid voltage clashing which will lead to fire outbreak.


CHAPTER TWO

LITERATURE REVIEW


2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …


How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)


Above is a preview excerpt of the full study on “Construction of an Automatic Change-over Switch with Indicator That Will Switch Load from the Mains Phcn Power Supply with Simplicity”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!

Download Material (Docx)