Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity

Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Electrical / Electronics Engineering (EE) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity


1.0 Introduction

Industrial automation and control has contributed immensely to the high rate of the world's technological growth. Power control and automation is a part of this field which is applied in virtually anywhere electrical power is used, generated or transmitted. Manual power change-over switches have been in existence and in different forms and shapes. 1959, the advent of microelectronics has paved way to modify the manually operated change-over switches. This project deals with the design and construction of automatic change-over switch with indicator. It eliminates the time and energy spent in operating the manual change – over and starting of Gen. Set. It is fully automated. It can be used in residential houses, offices and most importantly, in factories that required constant power supply. It has so many advantages over the existing ones/types.


1.1. Background Of The Study

This project work is embarked upon to eliminate nearly every shortcomings associated with the manually operated type to ensuring that it is fully automated.

This system is realized in several functional blocks all combined to form one functional system. The first block is a 3-phase MAINS regulated dc power supply unit that powers the overall circuit and acts as the input. The output of thin block is fed into a priority encoder (74147) which selects the most prioritized phase at a time. The third block is a BCD – to – DECIMAL Decoder (7442) used to decode the prioritized phase.

The fourth is the driver stage which comprises of NPN transistor that energizes the electromagnetic relay which switches the phase in priority. The Gen set switching section is achieved using the least prioritized phase. This section switches ON the Gen set when all the NEPA phases are low, OFF or faulty. Once the Gen set phase is selected, a switching transistor fires an SCR which conducts large battering current to the ignition coil of the Gen set. Panel indicators are used to show the status of the system.


1.2. Aims And Objectives Of The Project

The aims and objectives of this project is to:

  1. Design and construct an automatic change-over switch with indicator that will switch load from the mains power supply (PHCN) power supply (Generator) with simplicity.
  2. To introduce a circuitry that will sense power outage and at the same time sense fluctuation in the power supplied to the load at any point time.

1.3. Significance Of The Project

This project eliminates the stress, time delay and other drawbacks in manually operated types. The project is modified to display the phase in use at a particular time using a single seven segment Display and its appropriate circuitry.


1.4. Scope Of The Study

This project work was carried out primarily with the aim of solving the problem of manual change-over switch when there is need for changing to generator due to power failure from public power supply.
Also, the essence of this project work is to design and construct a 90A, 220V, 50Hz automatic change-over switch which will serve as a standby switch to generator when there is power outage.


1.5. Limitations Of The Project

Due to the principal operation of the device, it cannot switch two voltage supply once, during operation. So the power switching of the supplies depends on the state in which the device is, that means it can only be in an on or off state, so as to avoid voltage clashing which will lead to fire outbreak.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

Above is a preview excerpt of the full study on “Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity”. The complete material, including all five chapters, is available for download upon request.


To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


Seminar Material
₦3,000
Project Material
₦5,000

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


Account Details - For USSD / POS Transfer

ACCT NAMESPARKLYN SERVICES
Zenith Bank PLC1222599051
MoniePoint (MFB)8030511988
Paycom (OPay)8030511988

–– or ––



After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




You can get more research topics on Electrical / Electronics Engineering, if you did not see your preferred topic from the alternate list above.

Defense Procedure for Electrical / Electronics Engineering Researchers


In preparation for defending a project or seminar on Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.


Page Content Headings - Design and Construction of an Automatic Change-Over Switch with Indicator That Will Switch Load From the Mains Power Supply Generator with Simplicity

    Download Material (Docx)