📚 Departmental Project and Seminar Proposal Topics with Materials
Agricultural Economics and Extension
Banking and Finance (BF)
Business Administration and Management (BAM)
Computer Science (CS)
Curriculum Studies
Education
Electrical Electronics Engineering (EEE)
Entrepreneurship
Integrated Science Education
Library and Information Science (LIS)
Maritime and Transport
Mechanical Engineering
Midwifery
Nursing (Science)
📚 (2023) Project / Seminar Proposal Topics and Materials
Office Technology and Management (OTM)
Physical and Health Education
Primary Education
Public Health
Purchasing and Supply (PS)
Surveying and Geoinformatics
Tourism and Hospitality Management
Vocational Education
Entrepreneurial Skills
👗 Ankara Craft
📿 Bead Making
🎂 Cake Making
🧀 Chin-Chin Making
🛫 China Goods Importation
🎀 How to tie Gele
👄 Make-Up Guide
🥠 Meat-Pie Making
🎨 Paint Making
🕸 Pom-Pom Rug Making
🍵 Soap Making
💼 See More Skills to Learn


Compose Post Website URL Search Ad. Post Advert
Anonymous
Disaster Management Centre PortHarcourt
S

Disaster Management Centre Port-Harcourt

Project / Seminar Material
Reference ID: PS-191-TM

DEDICATION

This research work titled "Disaster Management Centre Port-Harcourt" is dedicated to God for his enabling grace and to all computer enthusiasts who help to make life a pleasant experience.



i

ACKNOWLEDGEMENT

I owe my indebtedness to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Architecture, Book Authors and Profound Scholars of existing/related research work for your moral support that facilitated the successful completion of my (Tertiary Institution level). I am grateful to God Almighty and my parent for their financial support in my career. I really appreciate you all for everything, Thank you very much.



ii


Disaster Management Centre Port-Harcourt

TABLE OF CONTENTS

Preliminary Pages

Chapter One

Introduction

  • 1.1 Background …

Chapter Two

Literature Review

  • 2.1 Introduction

Chapter Three

Research Methodology

  • 3.1 Introduction

Chapter Four

Results and Discussion

  • 4.1 Introduction

Chapter Five

Summary, Conclusion, and Recommendation

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion
  • 5.4 Recommendation

References




iii


Disaster Management Centre Port-Harcourt

CHAPTER ONE

1.0 Introduction
1.1 Background To The Study
The Need For A Disaster Management Centre
Disaster means a progressive or sudden, widespread or localised, natural or human caused occurrence which causes or threatens to cause; Death, injury or disease, Damage to property, infrastructure or the environment, Disruption of the life of a community; and is of the magnitude that exceeds the ability of those affected by the disaster to cope with its effect using only their own resources.
A disaster management centre is needed to:
  1. To implement an integrated and coordinate disaster management policy that focuses on preventing or reducing the risk disasters, mitigating the severity of disasters, emergency preparedness, rapid and effective response to disasters and post disaster recovery.
  2. To prepare the document that will identify risks, assess risks, risk response development and risk response control.

The purpose of centre is to outline policy and procedures for both proactive disaster prevention and the re-active disaster response and mitigation phases.
The disaster management centre functions are as follows:
  1. Must specialise in issues concerning disasters within Rivers State.
  2. Act as a repository and conduit for information concerning disasters.
  3. Must perform it functions and exercise powers as stipulated section 44 of the Disaster Management Act, 57 of 2002.
  4. Must liaise and co-ordinate its activities with those of National, State Management centres.

1.2 Statement Of Architectural Problems
Architecture is an abstraction from nature and intuition with possibilities of aesthetic accompaniments for overall ambient satisfaction (Fashuyi, 2004). Nevertheless, this ideological perception must graft with sensitive issues bordering on culture, economy before Architecture can become acceptable in its right values. However, Architectural Education in Nigeria as presently structured is not responsive to her socio-economic environment. In fact, it is more suited to problems of urban environment of prosperous economies having nothing in common with the cultural and economic features of the country (Adesina, 1987). Architectural Education in Nigeria was inherited from the Beaux-Art concept of Western educational philosophy through the colonial mentors. This tendency is to provide aesthetically satisfying buildings, irrespective of function.
The design of the Disaster Management Centre will take into cognisance proper functional relationship between each section of the building to another; the site is located at an area that can be easily accessible from various parts of the state, helicopters are also available to ease rescue in parts of the states that cannot be easily assessable by land, the structure is responsive to the socio-economic environment in the state, the structure is aesthetically satisfying, the structure conforms to the building codes and zoning.
Therefore architectural problems of the Disaster Management Centre Are as follows:
  1. The integration of architectural purpose, site, suitable spaces, technical systems and materials.
  2. Inadequate ventilation and natural lightening
  3. Primary and secondary circulation in and around the site.

1.3 Motivation
Disaster Management is an enormous task. Disasters are not confined to any particular location; neither do they disappear as quickly as they appear. Therefore, it is imperative that there is proper management to optimize efficiency of planning and response. Due to limited resources, collaborative efforts at the governmental, private and community levels are necessary. This level of collaboration requires a coordinated and organized effort to mitigate against, prepare for, respond to, and recover from emergencies and their effects in the shortest possible time.
The motivation of this project steams from:
The absolute necessity for such a project: Over the years, lives have been lost in natural and man-made disaster primarily due to absence of a disaster management centre or slow response of rescue team.
The wealth of knowledge, which the project adds to existing information on architectural building types.
The sense of comfort and security inspired by the project, being from the riverine area in the Niger Delta region where the terrain is difficult and inter-city transport is mostly done by boat, the potential for boat mishaps is rather high.
  1. To reduce subsequent insurance claims and compensation on government and insurance companies.
  2. The passion to create an avenue that will aid for relief to all disaster victims.
  3. To create awareness for the need of disaster management.

1.4 Aims Of The Study
  1. To provide a facility that will improve response to disasters for an initial period after which other sources would assist.
  2. To reduce confusion on the part of all personnel concern in disasters.
  3. To enhance the role of rapid deployment of its personnel in response to emergency
  4. Preventing or reducing the risk of disasters and mitigating the severity or consequences of disasters
  5. A rapid and effective response to disasters and post- disaster recovery and rehabilitation.
  6. To ensure the survival of the maximum possible number of victims, keeping them in the best possible health in the circumstances.
  7. To re-establish self-sufficiency and essential services as quickly as possible for all population groups, with special attention to those whose needs are greatest: the most vulnerable and underprivileged.
  8. To repair or replace damaged infrastructure and regenerate viable economic activities. To do this in a manner that contributes to long-term development goals and reduces vulnerability to any future recurrence of potentially damaging hazards.
  9. In cases involving population displacements (due to any type of disaster) the aim is to find durable solutions as quickly as possible, while ensuring protection and assistance as necessary in the meantime.

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Complete Material Chapters of Disaster Management Centre PortHarcourt

Order Complete Material with Preferred Acquisition Method

Disaster Management Centre Port-Harcourt Complete Material can be acquired by placing an order for the material which will be sent in Microsoft Word (MS-Word) Format and the cost of acquisition is ₦3,000.

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


METHOD #1

Request Complete Material

Complete Material Chapters of Disaster Management Centre PortHarcourtClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages, Chapter 1-5, References, and Appendix.


METHOD #2

Account Details - For USSD / POS Transfer

Details


Account Name: Sparklyn Services
Account No: 1222599051
Account Type: Current
Bank Name: Zenith Bank PLC

After transaction, kindly inform Us with the contact details above.


METHOD #3

Sparklyn Services, duly registered with the Corporate Affairs Commission (CAC) under the Federal Law with RC: 2994849 operates on Secure Sockets Layer (SSL), therefore all transactions on this site is secured and safe!

Order Complete Material with Card
Full Name
Phone Number
Email Address
Currency Type
Research Topic

By ordering complete material, it means that you've accepted or agreed to our terms of use.

Secured by Paystack

Disaster Management Centre Port-Harcourt


Disclaimer for Complete Material Utilization

The displayed research work titled "Disaster Management Centre Port-Harcourt" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as Sparklyn Services (sparklyn.com.ng) will not be liable for any who copied the material.
By ordering the complete research guideline, it signifies that you've accepted our terms of service.


Didn't find your Preferred Topic? Perform an Instant Topic Search

Your preferred topic wasn't listed? Click here to view more Architecture proposal topics

Proposal Writing Format under Architecture


Disaster Management Centre Port-Harcourt is a proposal topic for final year research work, which comprises the major and elective project proposal writing sections for Disaster Management Centre Port-Harcourt research work.

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Relevant Research Questions

  • Relevant Research Hypotheses


Defense Procedure for Architecture Researchers


Know your Project / Seminar Work (Disaster Management Centre Port-Harcourt): Here are the key point to study if your work is cumbersome or not.

  • Abstract

CHAPTER ONE

  • Motivation / Statement of Problems
  • Aims & Objective of Study
  • Scope of Study
  • Significance of Study

CHAPTER TWO

  • State two or more citation from your review of related literature.

CHAPTER THREE

  • Know the methodologies, tools and techniques used.

CHAPTER FOUR

  • Justification of your work and things to adhered to before using the system or research work.

CHAPTER FIVE

  • Conclusion and Recommendation

Dress Code: Your dress code should be cooperate wear for example; putting on suit and tie during project defense gives you an automatic mark without a word.

External Examiner / Supervisor Questioning & Student Answering: Questions will come from the research work, any difficult or unknown question, kindly say "Sorry Sir/Madam, the question is not within my scope of study".


List of Departmental Project Proposal Topics


Summary Headlines for Disaster Management Centre Port-Harcourt




    NEED HELP? CALL US 24/7:
    +234 803 051 1988