Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry

Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Quantity Surveying (QS) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies
    • 2.5 Research Gaps
    • 2.6 Summary of Literature Review

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”



    ABSTRACT

    The complex nature of the construction project and the unstable nature of Nigerian economy result in cost escalation of construction materials and equipments and untimely completion of project make it necessary to employ the use of project management practices Nigeria. Investigations were carried out through administration of questionnaire and data were collected from professionals firms, such as quantity surveyor, architects and engineers. The statistical tools used in analyzing the data include tables and simple percentages.

    The findings obtained after analysis of the data from the questionnaire, shows that there is a standard practice of project management in Nigeria. Problems such as clients not stating their requirements to the project manager, late appointment of manager and denial of project manager proper authority to execute their function which causes most of the problems associated with project management services. And suggestions were made in an attempt to find solution to the problems which include advice offered to the client to employ project managers at the inception and state the requirement clearly to them, so that they can state the requirement clearly to them, so that they can execute their functions to achieve project objectives.



    Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry


    1.0 Introduction

    1.1 Background of the Study

    The management of construction projects requires knowledge of modem management as well as an understanding of the design and construction process (Cecmu.ed, 2021). According to David (2006) a project is define as a temporary endeavour undertaken to create a unique project or services. Temporary means that every project has a definite beginning and a definite end. Unique means that the product or services is different in some distinguishing way from all similar product Or services. Dannis 2007 define project as capital investment to develop facilities to provide goods and services.

    from the above definitions of project, all projects require management and management has been given a number of definitions among which are: Martin defines management as the planning, organizing, directing and controlling of activities of business enterprise. Martin (2002) defined management as the coordination of all resources of an organization through the process of planning, organizing, budgeting and controlling in order to achieve organization objectives.

    Martin (2002) defined management as the coordination of all resources of an organization through the process of planning, organizing, budgeting and controlling in order to achieve organization objectives.

    The management of project adhesive known as project management according to (CIOB 2002) project management as the overall planning coordination and control of a project from inception to completion, aimed at meeting a clients requirement in order to produce a functionally and financially viable project that will be completed on time within authorized cost and to the required quality standards.

    Adoptability is defines as the acceptance of a particular method or policy in order to achieve certain objectives (Oxford advance Dictionary, 6th edition).

    Adoption of project management was often more accepted, placing the project manager functional manager and project professionals in indigenous roles trying to support project needs, Lock (2007).


    1.2 Statement of Problem

    In Nigeria, the implementation of modern project management tools methods and techniques is still not well established in public sector, this result into failure of public institutions and their contractor in performing their duties concerning the budget, specification and deadlines in project delivery and lack of financial support as barriers to successful project planning and execution in Nigeria public sector, Idoro and Ajayi (2009). The difficult nature of construction project, resulting to cost overshoot of construction materials and equipment, also affect delay in project completion makes it pertinent in adopting the application of project management.


    1.3 Need of the Study

    The growing need for a better understanding of the clients requirement in terms of functionality, financial control, time and a very much better clearer coordination of the work of consultants and contractors have all contributed to the need for project management. The complex nature of Nigeria economy, resulting in cost escalation of construction materials and equipments and untimely completion of projects making it necessary to employ the use of project management. Clients are becoming more certain in their requirement, they demand for timely completion of the project as well as keeping the project cost within budget so as to obtain good value for their money. David (2006).


    1.4 Aim of the Study

    To investigate the extent of adoption of project management practices in the Nigerian construction industry.


    1.5 Objectives of the Study

    In achieving the above stated aim, the following specific objectives were laid out as follows:

    1. To identify the project management practice in the Nigerian construction industry.
    2. To determine the extent of adoption of project management practice in the Nigerian construction industry.
    3. To establish if there is a barrier in adoption of project management practice.

    1.6 Scope of Study

    This research work is carried out in construction firms that practice project management within the period of 2010 to 2015. And the research will be centered to the Federal Capital Territory Abuja.


    1.7 Limitations of the Study

    The researcher, no doubt undergoes some difficulties in carrying out this research work. difficulties of access to vital information which was treated by the staff of the organization as confidential.

    Some documents containing information which may be vital to the research work was withheld by the staff of the organization. Thereby making it difficult to access them.

    Procedures for storing information in some organization, serves also as limiting factors due to increase in obtaining them.


    CHAPTER TWO

    2.0 Literature Review

    2.1 Introduction

    This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

    Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

    Above is a preview excerpt of the full study on “Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry”. The complete material, including all five chapters, is available for download upon request.


    To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


    Seminar Material
    ₦3,000
    Project Material
    ₦5,000

    For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


    Account Details - For USSD / POS Transfer

    ACCT NAMESPARKLYN SERVICES
    Zenith Bank PLC1222599051
    MoniePoint (MFB)8030511988
    Paycom (OPay)8030511988

    –– or ––



    After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


    Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




    You can get more research topics on Quantity Surveying, if you did not see your preferred topic from the alternate list above.

    Defense Procedure for Quantity Surveying Researchers


    In preparation for defending a project or seminar on Investigation Into the Effectiveness of Total Quality Management (TQM) in the Nigerian Construction Industry, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


    Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


    Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


    During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.