Search Topic
Project Topics Seminar Topics Login Create Account
PARKLYN
ERVICES
· RC: 2994849

Single Phase Automatic Change Over Switch From Generator to
WhatsApp

Design and Construction of Single Phase Automatic Change over Switch from Generator to Power Holding Company of Nigeria (P.H.C.N)


The study aims to design and construct Single Phase Automatic Change Over Switch From Generator to Power Holding Company of Nigeria. Based on the research aim, you get all the sections listed in the table of contents provided by Sparklyn Services, covering Chapters One to Five, including the References. Please note that the complete material will be sent in Microsoft Word (.docx) format upon request, allowing you to make changes whenever needed.



Material Excerpt on Design and Construction of Single Phase Automatic Change over Switch from Generator to Power Holding Company of Nigeria (P.H.C.N)


PRELIMINARY PAGES

  • Title page
  • Approval page
  • Dedication
  • Acknowledgement
  • Table of Contents
  • Abstract

CHAPTER ONE

INTRODUCTION

  • 1.1 Introduction
  • 1.2 Background of Study
  • 1.3 Statement of the Problem
  • 1.4 Aim and Objectives of the Study
  • 1.5 Research Questions
  • 1.6 Research Hypothesis
  • 1.7 Significance of Study
  • 1.8 Scope of Study
  • 1.9 Limitations of the Study
  • 1.10 Operational Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Conceptual Review
  • 2.3 Theoretical Framework
  • ⋮
  • 2.4 Empirical Studies
  • 2.5 Research Gaps
  • 2.6 Summary of Literature Review

CHAPTER THREE

RESEARCH METHODOLOGY

  • 3.1 Research Design
  • 3.2 Area of the Study
  • 3.3 Population of the Study
  • 3.4 Sample Size and Sampling Techniques
  • 3.5 Validation of Research Instrument
  • 3.6 Method of Data Collection
  • 3.7 Method of Data Analysis
  • 3.8 Questionnaire Administration
  • 3.9 Ethical Consideration
  • 3.10 Statistical Analysis

CHAPTER FOUR

DATA ANALYSIS, RESULT AND DISCUSSION

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Re-statement of Research Questions
  • 4.4 Test of Hypotheses
  • 4.5 Discussion of Findings

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary of Findings
  • 5.3 Conclusion
  • 5.4 Recommendation
  • 5.5 Suggestion for Further Study

REFERENCES

APPENDIX A - “QUESTIONNAIRE”


ABSTRACT


The most industrial and commercial process are depedent on electrical power in the event of power interpretation, the change-over of power supplied by a public utility to a generator is usually performed manually, often resulting in wastage time. Moreover, mechanic and some house hold appliances damages occurs because of human errors. These can cause significant losses. This paper presents a design and construction of an automatic single phase change over switches that electrical power supplying from public to generator is to event of a power outage or insufficient voltage. The system uses electromechanical devices for it's operation.



1.0 Introduction

The need for sufficient power supply without much delay in switching to the alternative service brings about a system which can encounter the delay and losses that occurs in an event of public power failure.

However, power instability in developing countries creates need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation is required as the rate of power outage becomes predominantly high. Most households, industrial and commercial process department on power supply and the process of changeover are manual, series time is not only wasted but also creates devices or machine damage from human error during the change over connections, which could result in massive losses.

This change over switch system separate the source between the generator and public supply, when there is power supply outage from the public supply, with the installation of this system at homes, offices or industries, no man power is required for changing the load line to generator line thus, when the power supply is restored, some one has to put off the generator while the system changes switches itself to the public supply.

…

CHAPTER TWO


2.1 Introduction

This chapter presents existing knowledge, relevant theories, previous research findings, and the methods used by other researchers to provide background information on Design and Construction of Single Phase Automatic Change over Switch from Generator to Power Holding Company of Nigeria (P.H.C.N). This section also documents the state of the art on the subject under study and provides a comprehensive review of the existing literature. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …


How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)


Above is a preview excerpt of the full study on “Design and Construction of Single Phase Automatic Change over Switch from Generator to Power Holding Company of Nigeria (P.H.C.N)”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!