Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria

Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria

Project / Seminar Material
Reference ID: PS-4210-TM

DEDICATION

This research material titled “Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria” is dedicated to God for his enabling grace, and to all computer enthusiasts who contributed to make life a pleasant experience during my research documentation.

ACKNOWLEDGEMENT

I extend my sincere gratitude to all those who contributed to the completion of this project. Special thanks to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Quantity Surveying (QS), Book Authors and Profound Scholars of existing or related project material on “Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria” for their invaluable guidance, support, and expertise throughout the journey.

I am also grateful to your study area (mention any funding organizations, if applicable) for their financial assistance. This research would not have been possible without the encouragement and assistance of some stakeholders (mention any mentors, teachers, or colleagues). Additionally, I would like to acknowledge the understanding and patience of my family and friends during this endeavor. Your unwavering support has been a constant source of motivation. Thank you all for being part of this meaningful endeavor.

TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction
    • 2.2 Conceptual Review
    • 2.3 Theoretical Framework
    • 2.4 Empirical Studies

    CHAPTER THREE

    RESEARCH METHODOLOGY

    • 3.1 Introduction
    • 3.2 Research Design
    • 3.3 Population of Study
    • 3.4 Sampling and Sampling Technique
    • 3.5 Validation of Research Instrument
    • 3.6 Method of Data Collection
    • 3.7 Method of Data Analysis
    • 3.8 Questionnaire Administration
    • 3.9 Ethical Consideration
    • 3.10 Statistical Analysis

    CHAPTER FOUR

    DATA ANALYSIS, RESULT AND DISCUSSION

    • 4.1 Introduction
    • 4.2 Presentation and Analysis of Data
    • 4.3 Re-statement of Research Questions
    • 4.4 Test of Hypotheses
    • 4.5 Discussion of Findings

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary of Findings
    • 5.3 Conclusion
    • 5.4 Recommendation
    • 5.5 Suggestion for Further Study

    REFERENCES

    APPENDIX A - “QUESTIONNAIRE”


    Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria

    CHAPTER ONE

    1.0 Introduction

    1.1 Background Of The Study

    Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignored by other participants in the development process, particularly planners, architects and construction specialists. This is now changing. Close attention is now paid to the feasibility and viability (and profitability) of development proposals as government and other stakeholders seek to extract developer and/or landowner contributions to affordable housing, public services and infrastructure.

    Consequently theory, application and outputs from development appraisal are under intense scrutiny from a wide range of users. Since Circular 05/05 proposed the submission of financial information? to provide a basis for negotiations between developers and local planning authorities about viable levels of affordable housing, tests of the financial viability of development projects have become an integral part of the planning process, both at the forward planning and development control stages.

    At the large-scale, macro-level Strategic Housing Land Availability Assessments require proposed plans to be achievable. However, the timeframe for development can be decades rather than years and, as a result, generating detailed and reliable cost and revenue projections can be impractical. At the other end of the scale, viability appraisals are carried out to inform negotiations about affordable housing levels for a scheme about which there may be a high level of information on permitted development and expected costs over a relatively short timeframe.

    In terms of critical evaluation from the real estate academic community, development appraisal has remained something of a backwater. In contrast, often linked to market traumas, over the last four decades methods of appraising standing investment properties have been the subject of widespread academic and professional debate. Whilst the RICS monitors variance and accuracy of investment valuations, there is no comparative institutional evaluation of the performance of development appraisals. Nevertheless, conventional development viability models have been subject to some criticism, particularly their simplified composition, failure to mirror reality and theoretical weaknesses.


    1.2 Problem Statement

    The general low usage of formal feasibility and viability appraisal techniques by contractors and developers globally often culminates into project failures, incessant claims for variations, huge financial losses and sometimes brings discomfort for people who came to enjoy themselves at these recreational centres. (Allan et al, 2007).

    This situation is more prevalent in redevelopment projects due to the inevitable problems of unexpected additional work, excessive requirements and scope management issues, project funding not aligned with project plans, delay, structural failure, cost overrun, etc (Naaranoja and Uden, 2007). These problems or uncertainties, among others, increase the project risk and make their management crucial if success is desired.

    Some construction projects in Owerri Urban have been abandoned due to poor or no feasibility and viability appraisal on them, while some recreational developments Owerri Golf Club, Silver Bird Cinema etc have stood the test of time, due to proper planning and forecasting. This huge expenditure and apparent failure in the primary objectives of the project led to complaints, probe panels and subsequent abandonment of the project.

    Research has shown that financial, political and physical risks are the most significant to Nigerian Contractors (Dada, 2010). However, of the different levels of risk (country, market or project), there is shortage of research as to how Contractors approach project planning at organisational level.


    1.3 Aim and Objectives of Study

    The aim of the study is to Analyze the Impact of Feasibility Viability Study on Capital Project Development in Nigeria. In achieving this aim, the following specific objectives were laid out as follows:

    1. To explore feasibility and viability appraisal techniques used by Contractors of capital projects in Owerri Urban.
    2. To assess awareness and usage of formal feasibility and viability appraisal techniques by Contractors in Owerri Urban.
    3. To evaluate the impact of feasibility and viability appraisals on the development of capital projects in Owerri Urban.

    1.4 Research Questions

    The study came up with research questions so as to be able to ascertain the above stated objectives. The specific research questions for the study are stated below as follows:

    • What feasibility and viability appraisal techniques are used by capital project contractors in Owerri Urban?
    • How do you gather information about newer feasibility and viability appraisal techniques and strategies to be applied in your on-going projects?
    • What are the impacts of feasibility and viability appraisal on the development of capital projects?

    1.5 Research Hypothesis

    In order to pursue the objective of this study, the following generalized statements have been designed to guide and aids in obtaining the result for the experiment to be conducted. For this work, the null hypothesis will be represented with H0 while the alternative hypothesis will be represented with hypothesis H1.

    Hypothesis One

    • H0: There is no significant relationship between feasibility study and the performance of contractors.
    • H1: There is a significant relationship between feasibility study and the performance of contractors.

    Hypothesis Two

    • H0: Feasibility study does not enhance quality deliverable in capital projects.
    • H1: Feasibility study enhances quality deliverable in capital projects.

    1.6 Significance Of The Study

    This study gives a clear insight into the various ways in which Capital Project developers and owners in Owerri can maximise efficiency and profits through effective and efficient application of feasibility and viability appraisal methods and techniques. The study also gives a clear insight into the various impacts of feasibility and viability appraisal methods on the development of recreation properties in Owerri.

    The findings and recommendations of the researcher will help in building a strong and better appraisal technique and strategies for Capital Project developers in Owerri state. The impact of feasibility and viability on Capital Project development in Owerri Urban are outlined in-order for drastic measures to be taken to tackle any challenge property owners and developers may face when developing recreational centres in Owerri state.


    1.7 Scope Of Study

    This research focuses mainly on the impact of feasibility and viability appraisal on the development of capital projects in Owerri urban. Results and recommendations may not be used to generalise other Cities in Nigeria, as the researcher could not cover a wider scope due to financial and time constraints.

    Based on the findings of this study other possible researchable areas may include studies on the various effects of other aspects of recreational development such as property laws in Nigeria and property management and control.


    1.8 Limitations of the Study

    During the course of this study, there were some problems encountered which stood as limitations to the research work. Some of the limitations include:

    1. Time Constraint:

      The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.

    2. Financial Constraint:

      Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

    3. Initial Cooperation Delay from Respondents:

      A particular limitation of this work came as a result of the respondent refusal to offer their cooperation at the initial time they were contacted. This contributed in making the success of this research study difficult.

    CHAPTER TWO

    2.0 Literature Review

    2.1 Introduction

    This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

    Summary Headlines for Analysis of the Impact of Feasibility Viability Study on Capital Project Development in Nigeria