1.1 Introduction
All about electrical engineering is; generation, transmission and distribution. The generated energy must be transmitted via transformers and cables as well as distributed to end user's at required voltage level. Because of steady supply, network stability become issue of prime importance in this current era of electricity deregulation to network operators. From the word “contingency” which means an event or situation that might happen in the future and could cause problems. Therefore a contingency is an unexpected, but reasonably, likely sudden change in the power system, such as loss of a transmission line, generator, transformer, and opening of a circuit breaker in a transmitting substation in the power system. The purpose of contingency analysis is to analyze the power system in order to identify the overloads and problems that can occur due to a contingency. The importance of contingency analysis are by analyzing the effects of contingency events in advance, problems and unstable situations can be identified, critical configurations can be applied, and corrective actions can be planned. A power system is secure when it can withstand the loss of one or more elements and still continue operation without major problems. An elements of a power system usually refers to its electrical equipment e.g generator, transformer, transmission line, circuit breakers, etc. Element can also refer to the wider context of a group of device that together constitute an outage such as a BUSBAR which effectively goes out of service if one or more breakers do not operate correctly. An outage is the removal of equipment from service. It can be planned and intentional ie, due to maintenance, or unplanned ie, due to failure. This material contains electrical diagrams, circuits, illustrations and more (Very detailed).
As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Limitations of the Study and Definition of technical terms.
1.2 Statement of Problems
Contingency analysis is used as a study tool for the off-line analysis of contingency events, as an on-line tool to show operators what would be the effects of future outages. This allows the operators to be better prepared to react to outages by using pre-planned recovery scenarios. The likely things that cause overload and other problems that can occur due to contingency: Unplanned opening of a circuit breaker at the substation, Equipment failure, Transmission line loss, Voltage magnitude violation at modes (positively / negatively), and System frequency deviation from the nominal value.
1.3 Aim and Objectives of Study
The aim of the study is to analyze the Contingency of the Eastern Part of Nigeria Grid Network (330kv). In achieving this aim, the following specific objectives were laid out as follows:
- To conduct a contingency analysis on the 330KV transmission network.
- To Collect data on transformers and transmission lines, in 330KV power network.
- To use line parameters to verify the operating state of the 330kv power Network.
- To validate the investigation between the existing system and the improved compensation system.
1.4 Significance of Study
The importance of contingency analysis are by analyzing the effects of contingency events in advance, problems and unstable situations can be identified, critical configurations can be applied, and corrective actions can be planned.
This study will be of immense benefit to other researchers who intend to know more on this study and can also be used by non-researchers to build more on their research work. This study contributes to knowledge and could serve as a guide for other study.
1.5 Scope of Study
The study focuses on the Contingency Analysis of the Eastern Part of Nigeria Grid Network (330kv).
1.6 Limitations of the Study
During the course of this study, many things militated against its completion, some of which are:
- Time Constraint: The time frame given to accomplish this project was very short due to school academic calendar and it was carried out under pressure which made the researcher not to implement some necessary features.
- Research material: availability of research material is a major setback to the scope of the study.
- Frequent power failure: This made the researcher append more money on fuel to ensure sustainable power.
- Financial Constraint: Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet).