Search Topic
Project Topics Seminar Topics Login Create Account
PARKLYN
ERVICES
· RC: 2994849
25amps Single Phase Automatic Change Over
WhatsApp Channel

Design and Construction of 25amps Single Phase Automatic Change Over


The study aims to design and construct 25amps Single Phase Automatic Change Over. The material is an editable microsoft word document comprising preliminary pages, table of contents, abstract, chapters one to five, and references. Acknowledgement is also included, expressing gratitude to the individuals, institutions, and resources that contributed to the successful completion of the research, with materials and information sourced from the online platform sparklyn.com.ng, which provided valuable academic support.



Material Excerpt on Design and Construction of 25amps Single Phase Automatic Change Over


ABSTRACT


1.0 Introduction

As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.

It may not be taken seriously in some places where power supply is up to 90 constant or where intermittent outage causes no great damage. However, place where they have business centers, industrial centers and even cold rooms need to almost 100% supply. So in this case there is need to provide a standby power supply in the event of power outage. The most important task is just to provide a standby power supply by great attention is paid to the reliability of the system. That is immediately and change over without fluctuations.

The first type of change over switch were purely manual operated. They usually have three switch able position, main, off and generator. An arm is provided from where the operator can have access to the switching. Here, the effectiveness of the switching (i.e how fast it is effected each time power needs to be changed) largely depends on the operator. The change over system will be ineffective when the operator is not around.

The second generation of change over switches were made semi-automatic in which the mains power supply directly powers the contactors. This arrangement is wired is such a way that if the mains power supply fails, the contractors will all drop leaving the supply to the generator position. The effectiveness of the system will now depend on the operator top start up the generator on time.

The main problem suffered by the above mentioned two versions of the change over switch is that the operator must have to be continuously on duty for it to be very effective. They lent use full closed loop system to operate.



1.1 Introduction

In this section, Design and Construction of 25amps Single Phase Automatic Change Over is discussed, with relevant and recent citations. As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the aim and objectives of the study. Others are significance of the study, scope of work, research hypothesis and questions, limitation of the study and definition of terms.


1.4 Aim and Objectives of the Study

The objective of this research is to design and construct 25amps Single Phase Automatic Change Over. The specific objectives of this study include:


CHAPTER TWO


2.1 Introduction

This chapter presents existing knowledge, relevant theories, previous research findings, and the methods used by other researchers to provide background information on Design and Construction of 25amps Single Phase Automatic Change Over. This section also documents the state of the art on the subject under study and provides a comprehensive review of the existing literature. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …


How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)


Above is a preview excerpt of the full study on “Design and Construction of 25amps Single Phase Automatic Change Over”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!