DEDICATION

This research material titled “Material Balance Application for Brownfield Development” is dedicated to God for his enabling grace, and to all computer enthusiasts who contributed to make life a pleasant experience during my research documentation.

ACKNOWLEDGEMENT

I extend my sincere gratitude to all those who contributed to the completion of this project. Special thanks to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Petroleum Engineering, Book Authors and Profound Scholars of existing or related project material on “Material Balance Application for Brownfield Development” for their invaluable guidance, support, and expertise throughout the journey.

I am also grateful to your study area (mention any funding organizations, if applicable) for their financial assistance. This research would not have been possible without the encouragement and assistance of some stakeholders (mention any mentors, teachers, or colleagues). Additionally, I would like to acknowledge the understanding and patience of my family and friends during this endeavor. Your unwavering support has been a constant source of motivation. Thank you all for being part of this meaningful endeavor.

ABSTRACT

The need to re-develop one of the Brown fields located in the Niger Delta area of Nigeria was necessitated by the fact that there are still three undeveloped reservoirs in the field.

A total of six stacked reservoirs, A100 to A600 (all oil bearing with associated gas) were penetrated between 8552 ftss and 10652 ftss by APV-1 well. Reservoir blocks A200 and A600 are the largest in the field accounting for 77% of the total field STOIIP. The well was completed with a Two String Multiple (TSM) on the two levels, with the short string producing from the A200 reservoir and the long string producing from the deeper A600 reservoir, A300 behind the sleeve.

The purpose of this research is to identify the best developmental plan to produce the reservoirs, either with a TSM completion or with a Smart well completion based on the economics. There are many single well fields in the Niger Delta area of Nigeria that have not been optimally produced, hence this study seeks to maximize the life of this field.

The reservoirs were simulated and production forecast carried out amounted to 14.55 MMstb for a period of 16 years.

After economic analysis was performed, the Net Present Value for the TSM and the Smart well completion were US $MM 241.9 and 248.88 respectively and an Internal Rate of Return of 155% and 202% respectively, hence the Smart well development plan is recommended.


Material Balance Application for Brownfield Development

CHAPTER ONE

1.0 Introduction

1.1 Background of the Study

Petroleum reserves are declining, and fewer noteworthy discoveries have been made in recent years (Abdus, 1990). The need to increase recovery from the vast amount of remaining oil and to compete globally require healthier reservoir management practices (Abdus et al, 1994).

However, technological developments in all areas of petroleum exploration and exploitation, along with fast increasing computing power, are providing the tools to better develop and manage reservoirs to maximize economic recovery of hydrocarbons (Abdus, 1990).

A reservoir's life begins with exploration, which leads to discovery; reservoir delineation; field development; production by primary, secondary and tertiary means; and abandonment (Figure. 1.1).

Sound reservoir management is the key to successful operation of the reservoir throughout its entire life. It is a continuous course, unlike how the baton is passed in traditional E&P organizations (Abdus et al, 1994).

Reservoir Management is all about excellence in the Operate phase of an E&P project life cycle. This is the only phase (Operate) that earns income, to provide the return on investment and it is the longest of the four (4) E & P business phases (Exploration, Appraisal, Development and Operate) spanning decades. (Shell WRM Operational Excellence, 2010).

Complete reservoir management requires the use of both human and technological resources for maximizing profits (Abdus et al, 1994). It requires good coordination of geologists, geophysicists, production, and petroleum engineers to advance petroleum exploration, development, and production. Also, technological advances and computer tools can facilitate better reservoir management as well as enhance economic recovery of hydrocarbons. Even a 11 small percent increase in recovery efficiency could amount to significant additional recovery and profit.

These incentives and challenges provide the motivation to sound reservoir management. Reservoir simulation is the way by which one uses a numerical model of the geological and petrophysical characteristics of a hydrocarbon reservoir to analyze and predict fluid behavior in the reservoir over time.

In its simple form, a reservoir simulation model is made up of three parts:

  1. A geological model in the form of a volumetric grid with face properties that describes the given porous rock formation;
  2. A flow model that defines how fluids flow in a porous medium, typically given as a set of partial differential equations expressing conservation of mass or volumes together with suitable closure relations; and
  3. A well model that describes the flow in and out of the reservoir, including a model for flow within the well bore and any coupling to flow control devices or surface facilities (Lie, 1994).

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Summary Headlines for Material Balance Application for Brownfield Development