The Effects of Construction Delays on Projects Delivery in Nigeria

The Effects of Construction Delays on Projects Delivery in Nigeria

Project / Seminar Material
Reference ID: PS-8704-TM

DEDICATION

This research material titled “The Effects of Construction Delays on Projects Delivery in Nigeria” is dedicated to God for his enabling grace, and to all computer enthusiasts who contributed to make life a pleasant experience during my research documentation.

ACKNOWLEDGEMENT

I extend my sincere gratitude to all those who contributed to the completion of this project. Special thanks to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Environmental Science, Book Authors and Profound Scholars of existing or related project material on “The Effects of Construction Delays on Projects Delivery in Nigeria” for their invaluable guidance, support, and expertise throughout the journey.

I am also grateful to your study area (mention any funding organizations, if applicable) for their financial assistance. This research would not have been possible without the encouragement and assistance of some stakeholders (mention any mentors, teachers, or colleagues). Additionally, I would like to acknowledge the understanding and patience of my family and friends during this endeavor. Your unwavering support has been a constant source of motivation. Thank you all for being part of this meaningful endeavor.


The Effects of Construction Delays on Projects Delivery in Nigeria

TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE:

Introduction

  • 1.1 Background of the Study
  • 1.2 Statement of the Problem
  • 1.3 Objectives of the Study
  • 1.4 Research Questions
  • 1.5 Research Hypotheses
  • 1.6 Significance of the Study
  • 1.7 Scope/ Limitation of the Study
  • 1.8 Definition of Terms

CHAPTER TWO:

Review of Related Literature

  • 2.1 Introduction
  • 2.2 Conceptual Framework
  • 2.3 Theoretical Framework
  • 2.4 Empirical Review

CHAPTER THREE:

Research Methodology

  • 3.1 Introduction
  • 3.1 Research Design
  • 3.3 Area of the Study
  • 3.4 Population of the Study
  • 3.5 Sample Size and Sampling Techniques
  • 3.6 Instrumentation
  • 3.7 Validation of the Instrument
  • 3.8 Administration of the Instrument
  • 3.9 Method of Data Analysis

CHAPTER FOUR:

Presentation, Analysis and Interpretation of Data

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Testing of Hypotheses
  • 4.4 Discussion of Findings

CHAPTER FIVE:

Summary, Conclusion and Recommendations

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion

REFERENCES

ABSTRACT

Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays.


The Effects of Construction Delays on Projects Delivery in Nigeria

CHAPTER ONE

1.1 Introduction

… As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the Aim and Objectives of the study. Others are Significance of the study, Scope of work, Research hypothesis and questions, Limitation of the study and Definition of technical terms.

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Summary Headlines for The Effects of Construction Delays on Projects Delivery in Nigeria