📚 Departmental Project and Seminar Proposal Topics with Materials
Adult Education
Building Technology (BT)
Business Administration and Management (BAM)
Business Education
Civil Engineering
Computer Engineering
Cooperative Economics and Management (CEM)
Criminology and Security Studies
Curriculum Studies
Economics
English Education
Guidance and Counselling
Maritime and Transport
Mass Communication (MC)
📚 (2023) Project / Seminar Proposal Topics and Materials

Search for Project and Seminar Topics Post Advertisement Items for Promotion
Anonymous
Design and Implementation of an Inventory Management Software for Offices A Case Study of NBC Plc 9th Mile Corner Ngwo
S

Software Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo)

C.S. Project Software
Reference ID: SD-5276-CS

Software Implementation under Computer Science (CS)

Software Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo) can be acquired by Contacting or Whatsapping Sparklyn Services Software Programmer with the number displayed below 👇

DEDICATION

This research work titled "Design and Implementation of an Inventory Management Software for Offices" is dedicated to God for his enabling grace and to all computer enthusiasts who help to make life a pleasant experience.



i

ACKNOWLEDGEMENT

I owe my indebtedness to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Computer Science (CS), Book Authors and Profound Scholars of existing/related research work for your moral support that facilitated the successful completion of my (Tertiary Institution level). I am grateful to God Almighty and my parent for their financial support in my career. I really appreciate you all for everything, Thank you very much.



ii


Design and Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo)

TABLE OF CONTENTS

PRELIMINARY PAGES

CHAPTER ONE

Introduction

1.1 Statement of the problems

1.2 Purpose of study

1.3 Aims and objectives

1.4 Scope of the study

1.5 Limitation of the study

1.6 Definition of terms

CHAPTER TWO

Literature Review

CHAPTER THREE

Overview Of The Existing System

3.1 Description of the existing system

3.2 Methods of data collection used

3.2.1 Interview method

3.2.2 Reference to written test

3.3 Organizational structure

3.4 Input analysis

3.5 Process analysis

3.6 Output analysis

3.7 Problem of the existing system

3.8 Justification of the new system

CHAPTER FOUR

Design Of The New System

4.1 Output specification and design

4.2 Input specification and design

4.3 File design

4.4 Procedure chart

4.5 System flow chart

4.6 System requirement

CHAPTER FIVE

Implementation

5.1 Program design

5.2 Program flowchart

5.3 Psudo code

5.4 Source listing

5.5 Text run

CHAPTER SIX

Documentation

CHAPTER SEVEN

Conclusion And Recommendations

7.1 Conclusion

7.2 Recommendation

Bibliography




iii

ABSTRACT

This project is on design and implementation of a computerized office inventory system that is based on a system of valuation known as office system due to pluctuation of market price. The project is also aimed at finding out how computer can be applied to office inventory system.

The prevalent method of controlling inventory in most offices is manual method, which has a lot of set backs. Such set backs include tedious ecorical worck, delay in transaction and time wastages in file assessment and accuracy of inventory record. It is therefore of great importance to carry out this research aimed at finding out how computer can help to maintain efficient and accurate records of goods in stock, and also making updating easy, all at a fantastic speed.

The information to this study is gotten through oral interview and record inspection of some offices.

This enables one to get information about the old system and how the benefit the proposed system have over the one i.e. the cost benefit analysis matter.





iv


Design and Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo)

CHAPTER ONE

Introduction

In an organization, it is very essential and need greater attention towards effort made to achieve and mandation an economic balance between the cost incurred and saved, by holding material in stock.

This process can be obtained by ensuring that the acquisition, storage, handling and usage of raw material are fully controlled at all times. This process is considered under the study of office inventory system which embraces, the total raw material to be used, work in progress and the stock counting of the finished goods.

Inventory then means the measured amount of goods, which varies in quantity overtime in response to “demand” process, which operates to diminish the stock and an “repleshement” process, which operates to increase it.

Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most

Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most organization periodic and office system, which was defined by new lexicon Webster dictionary as records maintained for a manufacturing business so that, they show a continuous inventory of such items as raw materials and goods in process.

For further implementation of this study, reference will be made to offices when the problems faced with inventory management is proposed to be narrowed down with the aid of computer to make work easier and to achieve accurate results, when updating files and also assessment of files.

1.1 Statement Of Problem

Generally, in inventory system, some of the problem encountered in relation to office inventory system are considered in three stages.

  1. The planning stage in how the raw material needed for production are gotten, what kind of raw materials needed too.
  2. Production stage
  3. The finished goods product. Before a product, the company or the organization encountered the problem of:
    1. Seeking for the consent of the marketing manager of the company on how profitable the particular product to be produced is in the market.
    2. Consumption pattern: This depends in the quality of the product, the quantity and the purchasing power.
    3. Problem of working off-take, this is the estimated quantity of product to be produced at a given period in time problem.
    4. Head − time problem.
    5. Not providing a competent coverage for the raw materials ordered for.
    6. Purchase of sub-standard materials, which could result to wastage and low quantity product, damaging of machine and will eventually affect the profitability of the organization.
    7. Having an unrealistic supplier.

Problem Associated With The Production

  1. The percentage permulation of the product, it should not be determined by assumption.
  2. Individual mistake
  3. Not putting the shelf of the product into consideration

Problem Associated With The Finished Goods.

  1. The order level of the production or stock level or consumption.
  2. The price of the product: It depends on the availability of capital and the opportunity to acquire item at low price.
  3. The risk of obsolescence and determination.
  4. The cost of stage and space available.
  5. Insurance cost
  6. Government regulation
  7. Transport cost.
  8. Improper stock counting

1.2 The Purpose Of The Study

The purpose of this study is to minimize the numerous setback associated with manual system of inventory system. These setbacks, tends to diminish the progress of many companies.

This project also serves, as a motivator to many organizations or companies by exposing the greeter advantages computer can be if effectively implemented.

Furthermore no major categorization of staff activity exists in the inventory system. However to appreciate how system carries out this functions to meet it’s set objectives various activities that take place in the system are described below:-

  1. The pre-order activities
  2. The order activities
  3. The receiving and checking activities
  4. Storing and distribution
  5. File updating
  6. Accounting and report activities.

1.3 Objective Of The Study

The main objective of this study is to maintain adequate stick level of the product by ordering acquiring and issuing while avoiding stoppages and consequent and increase cost of emergency action. And also relieve the management of the organization taking decision for every items carried in stock

  1. Receive and process request for materials needed for the products.
  2. Select relevant items needed for the product for ordering
  3. Ensure that orders are dispatched for immediately after completion for prompt supply of items
  4. Maintain a regular supply of raw materials of reasonable price and quantity and of a good quantity
  5. Ensure the follow up of ordered item when they are over due.
  6. The take of necessary action on the arrival of ordered items
  7. Prepare for payment of all items acquired by the company
  8. keep current records of the event occurring within the system.
  9. Compile a continuous report of the activities carried out during the specified period.
  10. Ensure that the various unit including the production unit stock unit and ware house receives the request on time.

1.4 The Scope Of The Study

In actual sense the scope of the problem of this study is narrowed down to ordering, stocking and delivering of the product out to customers and also the accounting and reporting of expenditure for all ordered and delivering made so find it reasonable to have the research to office inventory on stock of goods.


1.6 Definition Of Terms


Inventory:

It mans the aggregate of those items of tangible personnel property which are:

Held for sale in the ordinary cause of business.

In process of production for such sale. To be errantly consumed in production of goods or services to be available for sale.


Office Inventory:

A system of accounting for merchandise that provides a continuous record showing the Quantity and cost of all goods on hand. Also it is a carnival operation involving computing the theoretical balance after each issues of receipt


Coverage:

Frequently used interchangeably with the word protection” or” insurance”. The extent the insurance afforded under an insurance contract.


Order:

A written instruction or commission to do something such as buy sell negotiate or supply.


Computer:

This is an electronics mechanical device that accepts input process it and relinquishes information at a fantastic rate.


Updating:

This is the process of adding and altering a master file so that it process a arrant status.


Minimum Level:

It is otherwise called the buffer stock it is set by the rate of consumption recorder level and lead-in-time and at this point stock will not be allowed to fall.


Maximum Level:

This is the stock level which must not be exceeded at all time and it is determine by the rate of consumption reorder level and lead-in-time (delivering time)


Lead-In-Time:

The time between when items are ordered and when they arrived and are available for us.


File:

A collection of related records


Shelf Life:

The duration a practical or production can stay before it expires


Economic Ordinary Quality:

This is a calculated reorder quality which immunize the balance of cost between caring cost and ordinary cost.


Plant:

A restricted sense building as the term “plant and equipment also machinery use for manufacturing process.

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Complete Material Chapters of Design and Implementation of an Inventory Management Software for Offices A Case Study of NBC Plc 9th Mile Corner Ngwo

Order Complete Material with Preferred Acquisition Method

Design and Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo) Complete Material can be acquired by placing an order for the material which will be sent in Microsoft Word (MS-Word) Format and the cost of acquisition is ₦3,000.

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


METHOD #1

Request Complete Material

Complete Material Chapters of Design and Implementation of an Inventory Management Software for Offices A Case Study of NBC Plc 9th Mile Corner NgwoClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages, Chapter 1-5, References, and Appendix.


METHOD #2

Account Details - For USSD / POS Transfer

Details


Account Name: Sparklyn Services
Account No: 1222599051
Account Type: Current
Bank Name: Zenith Bank PLC

After transaction, kindly inform Us with the contact details above.


METHOD #3

Sparklyn Services, duly registered with the Corporate Affairs Commission (CAC) under the Federal Law with RC: 2994849 operates on Secure Sockets Layer (SSL), therefore all transactions on this site is secured and safe!

Order Complete Material with Card
Full Name
Phone Number
Email Address
Research Topic

Secured by Paystack

Disclaimer for Computer Science (CS) Research Material

The displayed research work titled "Design and Implementation of an Inventory Management Software for Offices" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as Sparklyn Services (sparklyn.com.ng) will not be liable for any who copied the material.
By ordering the complete research guideline, it signifies that you've accepted our terms of service.

Proposal Writing Format for Computer Science (CS) Research Work

Final year research work is all about finding real life problem and proffering solution that will partially or totally eliminate the existing system bottlenecks. The following are the major and elective project proposal writing sections for "Design and implementation of an inventory management software for offices (a case study of n.b.c plc 9th mile corner ngwo)" research work;

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)



Didn't find your Preferred Topic? Perform an Instant Topic Search

Your preferred topic wasn't listed? Click here to view more Computer Science proposal topics

Proposal Writing Format under Computer Science


Design and Implementation of an Inventory Management Software for Offices is a proposal topic for final year research work, which comprises the major and elective project proposal writing sections for Design and Implementation of an Inventory Management Software for Offices (A Case Study of N.B.C Plc 9th Mile Corner Ngwo) research work.

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)


Defense Procedure for Computer Science Researchers


Know your Project / Seminar Work (Design and Implementation of an Inventory Management Software for Offices): Here are the key point to study if your work is cumbersome or not.

  • Abstract

CHAPTER ONE

  • Motivation / Statement of Problems
  • Aims & Objective of Study
  • Scope of Study
  • Significance of Study

CHAPTER TWO

  • State two or more citation from your review of related literature.

CHAPTER THREE

  • Know the methodologies, tools and techniques used.

CHAPTER FOUR

  • Justification of your work and things to adhered to before using the system or research work.

CHAPTER FIVE

  • Conclusion and Recommendation

Dress Code: Your dress code should be cooperate wear for example; putting on suit and tie during project defense gives you an automatic mark without a word.

External Examiner / Supervisor Questioning & Student Answering: Questions will come from the research work, any difficult or unknown question, kindly say "Sorry Sir/Madam, the question is not within my scope of study".


List of Departmental Project Proposal Topics


Summary Headlines for Design and Implementation of an Inventory Management Software for Offices




    NEED HELP? CALL US 24/7:
    +234 803 051 1988