Project Topics Seminar Topics Post UTME Nursing Exam Past Questions
Search Topic
PARKLYN
ERVICES
· RC: 2994849
A Review of Application of Pressure Derivative Concept to Multirate Tests

A Review of Application of Pressure Derivative Concept to Multirate Tests

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “A Review of Application of Pressure Derivative Concept to Multirate Tests” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Petroleum Engineering for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on A Review of Application of Pressure Derivative Concept to Multirate Tests provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




ABSTRACT

Pressure build-up data in low permeability reservoirs take too long and are usually of poor quality. A pressure buildup test is perhaps the most widely performed transient test. In pressure buildup test, a well which has been producing for some time at a constant rate is shut-in and the bottom hole pressure is measured as a function of shut-in time. It is easier to conduct and interpret than most other transient tests, but often it is not economically feasible to shut in a well with a high production rate for a buildup test. Sand producing wells are not good candidates for long pressure drawdown tests. It is often impracticable to maintain a constant rate long enough to complete a drawdown test. In these cases, a multi-rate flow test should be run instead of buildup or drawdown tests. In most cases, the well is shut-in at the surface and as a result, some of the early time pressure data may be affected by wellbore storage. Actually a well-designed multi-rate flow test may minimize the influence of wellbore storage on pressure data.

A new technique based on the pressure derivative concept is presented for interpreting a multi-rate flow test. It is shown here that a Cartesian plot of the pressure derivative data versus a time group is a straight line from which the reservoir permeability can be estimated. It is also shown that for the case of two-rate test, Tiab's Direct Synthesis technique is applicable for calculating permeability and skin. A step by step procedure is presented for interpreting a multi-rate test using pressure and pressure derivative data. This new technique is illustrated by several numerical examples.



A Review of Application of Pressure Derivative Concept to Multirate Tests


1.0 Introduction

1.1 Overview

Pressure transient testing techniques are an important part of reservoir and production engineering. From the analysis of the pressure tests, the reservoir model can be recognized and the reservoir properties can be obtained. In order to determine such characteristics, drawdown and Buildup tests are performed. But to run successful pressure tests, many requirements have to be satisfied. For instance, pressure buildup analysis requires that:

  1. The well be shut in for a sufficient period of time ?t and
  2. The producing time, during the last constant rate prior to shut in, be four times longer than the total shut in time in order to obtain actual reservoir response.

Because we need to shut the well in, the pressure build up test is uneconomical both for high production wells and tight formations due to income loss. Drawdown tests require that:

  1. The well be shut in long enough, before the test is run to reach reservoir static pressure. And
  2. The flowrate be maintained constant during the entire test, which is quite difficult to achieve in practice. Pressure drawdown tests are not suitable for sand-producing wells.

Consequently, in order to overcome the drawbacks of the conventional single rate tests, a Multirate flow test should be run instead. A Multirate test is a draw down test conducted at several production rates (fig. 1). A well designed, performed, and analysed multirate test yields the same results as a single flowrate test, reduces income loss and removes the effects of flowrate fluctuations on the resulting pressure transient responses. An additional advantage is the minimization of phase redistribution effects. Such a test may be conducted if:

  1. An operator cannot afford to shut in a well for a build up test but wishes to obtain the same type of information that can be obtained from the build up test.
  2. Sand production prevents shutting in the well for a build up test.
  3. Phase segregation prevents the use of build up test.
  4. Required to do so by a regulatory agency as in the case of gas wells.
  5. Test began at a constant rate drawdown test, but the rate varied significantly during the test.

Reservoir parameters such as formation permeability, total skin factor, average reservoir pressure, and distance to a barrier if present, can be obtained from a Multirate test. In Multirate test, a well is flowed at a number of constant rates and the flowing BHP are recorded as a function of time. The constant rates should either be in increasing or decreasing order of magnitude. The effect can be modelled by considering a Multirate well to be several single rate well at same location, and each time the rate changes , a new well with rate equal to the total rate change is added to the calculation as shown in fig. 1.


1.2 Literature Review

A multi-rate test may be characterized by a series of constant flow rates, or uncontrolled variable rate. In fact, pressure build-up testing is a special type of multi-rate well test. The flow meters can aid in the design of both kinds of tests, variable or constant flow rates, and as a direct consequence more accurate analysis and results of their interpretation can be obtained. The approach presented here is based on the assumption that the system is infinite-acting and the logarithmic approximation to the line source solution of the diffusivity equation is applicable. The pressure behaviour caused by a variable flowrate is given by the principle of superposition with time.

The principle of superposition with time is used to develop a plot to determine the reservoir parameters. The principle states that adding solution to a linear differential equation results in a new solution to that differential equation but for different boundary condition. The concept of superposition entails:”Every flow rate change in a well will result in a pressure response which is independent of the pressure responses caused by other previous rate changes”.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

Above is a preview excerpt of the full study on “A Review of Application of Pressure Derivative Concept to Multirate Tests”. The complete material, including all five chapters, is available for download upon request.


To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


Seminar Material
₦3,000
Project Material
₦5,000

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


Account Details - For USSD / POS Transfer

ACCT NAMESPARKLYN SERVICES
Zenith Bank PLC1222599051
MoniePoint (MFB)8030511988
Paycom (OPay)8030511988

–– or ––



After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




You can get more research topics on Petroleum Engineering, if you did not see your preferred topic from the alternate list above.

Defense Procedure for Petroleum Engineering Researchers


In preparation for defending a project or seminar on A Review of Application of Pressure Derivative Concept to Multirate Tests, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.


Page Content Headings - A Review of Application of Pressure Derivative Concept to Multirate Tests

    Download Material (Docx)