Design and Implementation Computerized Power Monitoring System

Design and Implementation Computerized Power Monitoring System

@SparklynServices


DEDICATION

This research material, titled “Design and Implementation Computerized Power Monitoring System” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Computer Science (CS) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Design and Implementation Computerized Power Monitoring System provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




PRELIMINARY PAGES


CHAPTER ONE

INTRODUCTION


    CHAPTER TWO

    LITERATURE REVIEW

    • 2.1 Introduction

    CHAPTER THREE

    SYSTEM ANALYSIS AND DESIGN

    • 3.1 Methodology Adopted
    • 3.1.1 Problem Identification Using SSADM
    • 3.2 Analysis of the Existing System
    • 3.2.1 Dataflow of the Existing System
    • 3.2.2 Disadvantages Of The Existing System
    • 3.2.3 Weakness of the existing System
    • 3.3 Feasibility Study
    • 3.3.1 Economic Feasibility
    • 3.3.2 Technical Feasibility
    • 3.3.3 Operational Feasibility
    • 3.4 Analysis of the Proposed System
    • 3.4.1 Data Flow Diagram of the Proposed System
    • 3.4.2 Advantages of the Proposed System
    • 3.4.3 Justification of the Proposed System
    • 3.5 Functional Requirements
    • 3.5.1 Use Case Diagram Of The Admin / User Privileges
    • 3.6 Data Requirements
    • 3.7 High Level Model of the Proposed System

    CHAPTER FOUR

    SYSTEM DESIGN AND IMPLEMENTATION

    • 4.1 Objectives of the Design
    • 4.2 Cohesion and Decomposition High level Model
    • 4.3 Control Center / Overall Dataflow Diagram
    • 4.3.1 Proposed System Operation Flowchart
    • 4.4 System Specification and Design
    • 4.4.1 Input and Output Specification
    • 4.4.2 Database Specification and Design
    • 4.4.3 Data Dictionary
    • 4.5 Choice and Justification of Programming Language
    • 4.6 Program Documentation
    • 4.7 Implementation Techniques
    • 4.7.1 System Testing
    • 4.8 Programming Module Specification
    • 4.8.1 Installation
    • 4.9 Computer Hardware Minimum Requirement
    • 4.10 Software Requirement
    • 4.11 Personnel / User Training
    • 4.12 File Maintenance Module

    CHAPTER FIVE

    SUMMARY, CONCLUSION AND RECOMMENDATION

    • 5.1 Introduction
    • 5.2 Summary
    • 5.3 Conclusion
    • 5.4 Recommendation

    REFERENCES

    APPENDIX A - “SOURCE CODE”

    APPENDIX B - “OBJECT PROGRAM”



    ABSTRACT

    This project research is focused on show-casing the means of monitoring the distribution of electrical power across local stations using computerized systems. It examines the concept of a computerized system and its importance in the manipulation of data to present useful and reliable information that will be used for decision-making. The research intends to find out a means of improving the operations of the PHCN, Uyo, by carrying out an analysis on the present method of operation. Also, the study created a new system to replace the old manual system of operation using the results gotten from this research. The research collected information using different research techniques such as interview method, observation method and referencing method. The research collected materials from different texts, magazines and from the Internet.



    Design and Implementation Computerized Power Monitoring System



    Introduction

    1.1 Background Of The Study

    In a world like ours today there is every need to manage funds in every activity being carried out. It is the concern of every firm to control its finances to ensure that unnecessary expenses are avoided. Financial management in a company has proved to be a great task involving the monitor of almost all departments of the company. As such, companies tend to be severe about the tools being used to manage these resources of theirs. This is because financial resources have to do with figures, calculations and computations which may present errors if not properly handled. To this end a computerized system will go a long way to sort many issues in managing financial affairs.

    Monitoring power and issuing its bill is the job of Power Holding companies, and they intend to present this information to their customers/subscribers on time and precise. In Nigeria the situation is not different. The Power Holdings Company Nigeria (PHCN) PLC has been on the job for decades now. The issue now is how is it being done and whether the method being used yields the best results? With the growing rate of technology in our world today the question is not far fetched.

    The use of manual means of manipulation of records has been proved to have different flaws attached to it so companies are gradually turning on to information technology for aid. Offices are no longer known for the piles of paper and files that it usually had. Rather it is made of devices that make up an automated office system, devices like, desktops, laptops, printers, scanners, etc.

    A computerized system according to Friaser, C. (2007), involves the use of computer devices and connections to achieve tasks in a corporate environment. Using this type of system to manage activities will help solve problems of familiar problems being presented by manual systems.

    This research project is focused on showing how a computerized system can be modeled to monitor power outage and present bills for it. It studies the characteristics of a computerized system and its components.


    1.2 Statement Of Problem

    Over the years electricity monitoring in PHCN(usually known as NEPA) has been operated using manual systems and this constitute irrespective of its innate and intrinsic shortfall. When customers go to the billing sections to pay up their accrued bills, they get entrapped in long interminable queues to inefficient machines. In light of this, payment of bills turns out to be hard nut to crack for customers. On the other side of PHCN officials, it has been a tedious and cumbersome task to be abreast of the condition of electricity cables, transformers etc, and these inabilities contributes to their poor and torpid attention to critical power problems. As a matter of necessity, only an online, real-time monitoring transaction processing system can revert these plagues associated with manual procedures of power monitoring system.

    The question of turning to the computerized system rather than partially automated system which serves which serves as an impediments and discomfort due to poor operating environment becomes another problem to be resolved.


    1.3 Theoretical Background

    The National Electric Power Authority (NEPA), which is now known as Power Holding Company of Nigeria (PHCN), was established by decree 24 of 1972 via then electricity corporation of Nigeria and the Niger Dan Authority (NDA). It was accorded the mandate to generate, transmit, distribute, and market electricity.

    It has on its own the task to develop and to maintain an efficient coordinated and economical system of electricity supply to all parts of Nigeria and other parts of West Africa like Benin republic, Ghana and Niger republics in the northern part of Nigeria. In the bid to meet with its statutory responsibility geared towards the satisfaction of its customers need worldwide constitute the establishment of the Alausa-Ikeja road office, which has been functional over decades.

    Past, the system was not well efficient because the manipulations of the system were handled solely using humans’ operations which constituted different errors. In our time, it has become necessary to implement modern approaches to technology in order to manage activities of an organization.


    1.4 Objectives of the Study

    The objective of this study is to show how a computerized system can be built for the PHCN Uyo, to aid the handle of electricity monitoring and bill presentation for customers. The study examines the distinction between a manual and computerized system, and intends to settle the problems created by manual systems by modeled automated systems.

    To employ Information Technology (IT) potentials in customers service and the organization as a whole, as well as to ascertain whether computerized system is of positive impact to the general service structure or a threat to the staff’s job security.


    1.5 Significance of the Study

    Owing to the apparent and deliberate cynic approach of people towards the issue of whether or power monitoring system is expedient, the research project has the under-listed significance:

    1. Eliminates the problems inherent in the old power monitoring system/procedure by offering an automated real-time data processing approach.
    2. Reduce complaints by aggrieved customers owing to poor service thereby upholding the corporate image of PHCN.
    3. Educate PHCN officials of the use of computing operations to carry out transactions.
    4. To ginger further study and research on the topic by other students and academicians.

    1.6 Scope of the Study

    The scope of this study is focused on power monitoring in PHCN. It considers the procedures used for managing the billing system in PHCN and how a computerized system can contribute to the betterment of these activities. The study uses Power Holding Company of Nigeria (PHCN), Uyo as its case study.


    1.7 Definition of Terms

    Electric Power:

    Electric power is the rate of energy consumption in a circuit. The electric power is measured in units of watts.

    Capacitor:

    This is a passive two-terminal component used to store energy in an electric field.

    Monitoring:

    This generally means to be aware of the state of the system in order to control the system effectively.

    Bills:

    This is an amount of money owed for goods supplied or services rendered, set out in a printed or written statement of charge that is to be paid for at a later date by the consumers.

    Voltage:

    This is the potential energy that makes the electrical current flow in circuit by pushing the electrons around. It is how we measure the difference in electrical energy.

    Supply:

    This is the amount of electrical energy that is being released to a particular circuit within a particular. Supply determines the consumption of power.


    CHAPTER TWO

    2.0 Literature Review

    2.1 Introduction

    This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

    Procedure to Download the Complete Project (Seminar) Research Material

    Above is a preview excerpt of the full study on “Design and Implementation Computerized Power Monitoring System”. The complete material, including all five chapters, is available for download upon request.


    To obtain the complete research material content, simply place an order by paying the specified project or seminar fee below, and send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


    Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.


    Seminar Material
    ₦3,000
    Project Material
    ₦5,000

    For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.




    You can get more research topics on Computer Science, if you did not see your preferred topic from the alternate list above.

    Defense Procedure for Computer Science Researchers


    In preparation for defending a project or seminar on Design and Implementation Computerized Power Monitoring System, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


    Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


    Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


    During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.


    Page Content Headings - Design and Implementation Computerized Power Monitoring System

      Chat Sparklyn on WhatsApp