Economic Viability of a Small Hydropower Plant

Economic Viability of a Small Hydropower Plant

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “Economic Viability of a Small Hydropower Plant” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Mechanical Engineering for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Economic Viability of a Small Hydropower Plant provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




ABSTRACT

In this study the financial and economic feasibility of OnuakuRiver in Aku community of Abia state was evaluated using indicators like the Net Present value (NPV), Payback Period, Benefit cost ratio (BCR) and Internal Rate of Return (IRR) to ascertain the feasibility and viability of the project. Here the breakeven point of the project, profit, cash flow, present and future value of project as well as the expected yearly revenue of the project is shown in advance within the economic life or span of the project. Furthermore a sensitivity analysis to show the responds of the project to both variation in investment cost and the price of electricity, was also carried out using a Microsoft excel based platform to carry out the computations.

With an investment cost of less than N12million, a net present value of three million six hundred and thirty thousand, fifty seven naira fifty eight kobo,(N3,630,057.58) was gotten at the 30 years life span of the project with an internal rate of return of 14.25%. Also from the analysis a project payback period of ten years which is timely enough for the client or investor to recover the investment made on a project that can span up to thirty years (minimum) — fifty years (maximum).

The benefit cost ratio of the project from analysis is 1.23 which is above unity. Furthermore, sensitivity of the project to variations in investment cost showed that the project is sensitive to variation in the investment cost, as a 30% increase in investment cost throws the project into a negative NPV, and an IRR less than the hurdle rate of 12%. The sensitivity to the variation in the price of electricity shows how the project responds to reduction in electricity price, as a reduction by 20% in electricity price, throws the project into a negative net present value making the project not viable at 20% reduction in electricity price. Hence the results from the analysis above have provided additional information for the decision makers, client and the design engineer to see reasons why this project should be embarked on.



Economic Viability of a Small Hydropower Plant


1.0 Introduction

1.1 Background of the Study

All living things depend on energy for survival, and modern civilizations will continue to thrive only if existing sources of energy can be developed to meet the growing demands, hence Energy is “Life” Energy is“Existence”, it is the dividing line between the rich and the poor, between the developed, developing and the underdeveloped (Ohunakins et al., 2011). For a country to grow beyond its subsistence economy, tackle the problem of poverty, the country will need to have minimum access to energy services for the larger proportion of its population (Ohunakins et al., 2011). However, in Nigeria energy supply has been epileptic in nature, causing the socio-economic status of the country to be downgraded (Ohunakins et al., 2011).

Nigeria's energy demand increases with an increase in population, but power supply has remained unreliable and insufficient with a country generation capacity of about 3500 MW as at 2011 (Okeke, 2011). Nigeria as a nation has started feeling the impact of adverse climate change, that may be attributed to the overdependence on fossil fuel fired power plants which is the main source of greenhouse gas emissions (GHG), coupled with activities of manufacturing industries, oil prospecting firms and deforestation, to mention but a few.

Renewable energy (RE) has been identified as the only alternative of addressing these problems. RE is energy derived from an energy source that can generate itself through natural processes within a relatively short period; unlike fossil type resources that take millions of years to form and which is not regenerative.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

Above is a preview excerpt of the full study on “Economic Viability of a Small Hydropower Plant”. The complete material, including all five chapters, is available for download upon request.


To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


Seminar Material
₦3,000
Project Material
₦5,000

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


Account Details - For USSD / POS Transfer

ACCT NAMESPARKLYN SERVICES
Zenith Bank PLC1222599051
MoniePoint (MFB)8030511988
Paycom (OPay)8030511988

–– or ––



After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




You can get more research topics on Mechanical Engineering, if you did not see your preferred topic from the alternate list above.

Defense Procedure for Mechanical Engineering Researchers


In preparation for defending a project or seminar on Economic Viability of a Small Hydropower Plant, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.


Page Content Headings - Economic Viability of a Small Hydropower Plant

    Download Material (Docx)