Operation and Maintenance Schedule of a Steam Turbine Plant

Operation and Maintenance Schedule of a Steam Turbine Plant

@SparklynServices
WhatsApp Channel

DEDICATION

This research material, titled “Operation and Maintenance Schedule of a Steam Turbine Plant” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Mechanical Engineering for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Operation and Maintenance Schedule of a Steam Turbine Plant provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




PRELIMINARY PAGES


CHAPTER ONE

  • 1.0 Introduction
  • 1.1 The major components of a steam power plant
  • 1.1.1 Steam turbine
  • 1.1.2 Boiler
  • 1.1.3 Condenser
  • 1.2 Classification of power plant
  • 1.3 Existing power stations, location and their generated power in nigeria

CHAPTER TWO

  • 2.0 Power Plant
  • 2.1 History On Major Types of Power Plant
  • 2.1.1 Steam Power Plant
  • 2.1.2 Gas Power Plant
  • 2.1.3 Hydropower plant

CHAPTER THREE

  • 3.0 Operation and Maintenance of A Steam Power Plant Cycle
  • 3.1 The carnot vapor cycle
  • 3.2 Rankine cycle: The ideal for vapor power cycles
  • 3.3 Operations
  • 3.4 Energy analysis of the steam cycle
  • 3.5 Reheat cycle
  • 3.6 Regenerative cycle
  • 3.7 Maintenance of steam power plant accessories
  • 3.7.1 Maintenance of boiler
  • 3.7.2 General Requirements for a Safe and Efficient Boiler Room
  • 3.7.3 Maintenance of steam turbine

CHAPTER FOUR

  • 4.0 Performance Analysis of A Steam Power Plant
  • 4.1 Formula

CHAPTER FIVE

  • 5.0 Summary and Conclusions

REFERENCES

APPENDIX



ABSTRACT

Thermal electrical power generation is one of the major methods used in Egbin thermal station. Due to inconsistency and failure in the power supply in Nigeria, there is a need for a proper operation and maintenance schedule strategy of the various kinds of power plants accessories so as to facilitate their efficiencies and functionality.

Egbin thermal station, which is one of the major power generating stations in Nigeria was used as a case study. The station has an installed capacity of 1320 MW consisting of 6 units of 220MW each. It is in the generating sector of the Power Holding Company of Nigeria (PHCN) which is the state owned Electric Power company. Egbin thermal station was commissioned on 11th May, 1985.

Thermal electrical power generation is one of the major methods, used in Egbin thermal station. The major components of Egbin thermal station are boiler, steam turbine, condenser and the feed pumps.

The objective of this research was to study and enumerate profound solutions in order to minimize the risk of failure and effectively manage the reliability of the substation equipment, stemming from a proper maintenance strategy.

The operation and maintenance of Egbin Thermal station was examined and the conclusion was that it was challenged with insufficient Gas supply and restrictions, poor water quality and breakdown of two units due to boiler explosion in 2007, causing power generating plant to be shut down creating a 880 Mega Watts drop in power generation in the whole country. This occurrence has had a massive setback on the power plant, hence a proper maintenance strategy needs to be designed to curb the effect and develop a long lasting solution to prevent further potential disaster.



Operation and Maintenance Schedule of a Steam Turbine Plant


1.0 Introduction

This chapter gives a short introduction to the research subject and describes the classification of the power plant, existing power plants, location and their generated power in Nigeria. A thermal power station is a power plant in which the prime mover is steam driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator. After which it passes through the turbine, the steam is condensed in a condenser; this is known as the Rankine cycle.

Steam turbines are devices used to convert the pressure energy of high pressure steam to kinetic and hence electrical energy in power plants and certain types of engines. While steam turbines might be one of the more revolutionary inventions in the power generation and conversion industry. High performance steam turbines of today are specialized in their design and incorporate many efficiency increasing technologies.

Steam turbine maintenance is of high importance to keep the steam turbines efficiency high and to conform to safety standards to avoid any unforeseen dangers. The steam turbine operates under high steam pressures, and has a number of moving parts that move at extremely high velocities. The nozzles and turbine blades are designed via careful analysis and the parts are manufactured to a high degree of finish and accuracy.

A steam power plant continuously converts the energy stored in fossil fuels i.e. coal, oil, etc. or fossil fuels e.g. uranium, thorium into shaft work and ultimately into electricity. The working fluid is “water” which is sometimes in the liquid phase and sometimes in the vapor phase during its cycle of operations.

A fossil fuelled power plant is an example of bulk energy converter from fuel to electricity using “water” as the working medium. The energy released by the burning fuel is transferred to water in the boiler to generate steam at high temperature, which then expands in the steam at high temperature, which then expands in the steam turbine to a low pressure to produce shaft work. The steam leaving the turbine is condensed into water in the “condenser” where cooling water from a river or sea circulates, carrying away the heat released during condensation. The water (condensate) is then feedback to the boiler by the pump and the cycle goes on repeating itself.

Steam turbine power plants operate on “Rankine cycle” for the production of electric power. If the steam from the waste heat boiler is used for process or space heating, the term “cogeneration” is the more correct terminology (simultaneous production of electric and heat energy).

Steam turbine plants generally have a history of achieving up to 95% availability and can operate for more than a year between shutdowns for maintenance and inspections. Their unplanned or forced outage rates are typically less than 2% or less than one week per year. Modern large steam turbine plants (over 500MW) have efficiencies of about 40-45%. These plants have installed cost between $800 (441 euros) and $2000/KW (1500 euros), depending on environmental permitting requirements.

This paper presents an assessment of the state of thermal plants in Nigeria, with a view to suggesting solutions to remedy the deteriorating states of the plants, in order to improve the power supply system in the country.


CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

Procedure for Accessing and Downloading the Complete Material in PDF or DOCX Format

Above is a preview excerpt of the full study on “Operation and Maintenance Schedule of a Steam Turbine Plant”. The complete material, including all five chapters, is available for download upon request.


To obtain the complete research material content, simply place an order by paying the specified project or seminar fee using the account details or electronic payment (E-payment) system provided below.


Seminar Material
₦3,000
Project Material
₦5,000

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


Account Details - For USSD / POS Transfer

ACCT NAMESPARKLYN SERVICES
Zenith Bank PLC1222599051
MoniePoint (MFB)8030511988
Paycom (OPay)8030511988

–– or ––



After payment, send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.




You can get more research topics on Mechanical Engineering, if you did not see your preferred topic from the alternate list above.

Defense Procedure for Mechanical Engineering Researchers


In preparation for defending a project or seminar on Operation and Maintenance Schedule of a Steam Turbine Plant, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.