Quality Control as an Effective Tool for Efficient Project Delivery

Quality Control as an Effective Tool for Efficient Project Delivery

@SparklynServices


DEDICATION

This research material, titled “Quality Control as an Effective Tool for Efficient Project Delivery” is dedicated to God for His boundless grace and guidance. It is also a tribute to all computer enthusiasts whose contributions made my research journey smoother and enriched my documentation process, making the experience truly fulfilling.




ACKNOWLEDGEMENT

I am profoundly grateful to everyone who contributed to the successful completion of this project. I am especially grateful to my Supervisor (Name), the Head of Department (Name), and the Lecturers in the Department of Building Technology (BT) for their invaluable guidance and support. I also acknowledge the contributions of authors and scholars whose works on Quality Control as an Effective Tool for Efficient Project Delivery provided essential insights. Special thanks go to my study area (and any funding organizations, if applicable) for their financial assistance. I am equally thankful to stakeholders, including mentors, teachers, and colleagues, for their encouragement and support. Finally, I deeply appreciate my family and friends for their patience and unwavering support throughout this journey. Your contributions have been instrumental in making this research a reality.




PRELIMINARY PAGES


CHAPTER ONE

  • 1.0 Introduction
  • 1.1 Background of Study
  • 1.2 Statement of Problems
  • 1.3 Aim and Objectives
  • 1.4 Significance of the Study
  • 1.5 Research Question
  • 1.6 Delimitation
  • 1.7 Limitations
  • 1.8 Definition of Terms

CHAPTER TWO

  • 2.0 Literature Review
  • 2.1 Quality Control System
  • 2.2 Meaning of Quality
  • 2.3 Quality Characteristics
  • 2.4 How Quality is determined
  • 2.5 Quality Plan
  • 2.6 Quality Assurance
  • 2.7 Quality Audits
  • 2.8 Quality Control
  • 2.9 Quality Control Tools
  • 2.10 Quality Control Measure
  • 2.11 Quality Improvement
  • 2.11.1 Cost of Quality
  • 2.11.2 Leadership
  • 2.11.3 Maturity Models
  • 2.11.4 Continuous Improvement
  • 2.12 Factors that help Quality Control

CHAPTER THREE

  • 3.0 Research Methodology
  • 3.1.0 Design of the Study
  • 3.1.2 Area of the Study
  • 3.1.3 Population of the Study
  • 3.1.4 Sampling Techniques
  • 3.2.0 Data Collection and Analysis
  • 3.2.1 Method of Data Collection
  • 3.3 Method of Data Analysis

CHAPTER FOUR

  • 4.0 Data Presentation, Analysis
  • 4.1 Distribution and Retrieval
  • 4.2 Presentation of Data
  • 4.3 Discussion of Findings

CHAPTER FIVE

  • 5.0 Summary of Findings, Conclusions and Recommendations
  • 5.1 Summary of Findings
  • 5.2 Conclusion
  • 5.3 Recommendations

BIBLIOGRAPHY

  • QUESTIONNAIRE


  • ABSTRACT

    The construction industry has been characterized by improper quality control, inadequate planning and project abandonment. It is important to understand the benefits of quality control identify and reinforce good practice, to achieve this questionnaire was designed and distributed oral interview were made together with literature review.

    It has been noted that quality control is averagely adhere to in most construction sites, the use of quacks instead of professional and inadequate supervision has been the major problems inherent in the construction industry today in our country.

    Government should make it mandatory that buildings carry certificate of fitness for human habitation. Procurement method in use should be amended to allow professional builders to be more actively involved in the project from the planning, design and construction stages to ensure the build-ability and maintainability of the project.



    Quality Control as an Effective Tool for Efficient Project Delivery (A Case Study of Imo State)


    1.0 Introduction

    1.1 Background of the Study

    This research works deals on harnessing the intricacies of effective quality control of a project towards achieving a meaningful and more efficient project delivery. However, this work is out rightly concerned with the examination of certain managerial tools and techniques that are quite necessary in devising how to coordinate all of the activities that go on in a given project; developing a realistic schedule, controlling and monitoring the progress of the entire given project. It is also written to improve the standard of services provided to the client and beneficiaries through the implementation of quality control into the project.

    However, quality control costs can be reduced by the inspection of variables in the production process; these include the raw-materials, materials that go into the production processes, work in progress and the machinery used.


    1.2 Statement of the Problems

    Lack of adequate planning and supervision have posed many critical problems to the construction, manufacturing industry and other works of life, which has resulted into incessant project delivery which is becoming very predominant in our country Nigeria. Meanwhile from the research carried out on this context the following problems were identified and stated below:

    a) Improper assessment of tender documents

    b) Poor resource allocation

    c) Poor material selection

    d) The inability of the project team to adhere to standard.

    e) Lack of training of personnel

    f) Improper planning, schedule and activity definition

    g) Improper record keeping and documentation

    h) Ineffective leadership and control


    1.3 Aim and Objectives of the Study

    The thesis is aimed at gaining a better understanding of the benefits of quality control, identify and reinforce good practice. Critically reviewing the process of quality control in a project planning, programming and its techniques. Which enable the project team to organize their work to meet the classic triple project constraints for efficient project delivery.

    The objectives of the study comprise of the following:

    a) To maintain quality standard

    b) To ensure customer's satisfaction

    c) To reduce the costs associated with scrap

    d) Influence of government policy on execution of project.

    e) Project monitoring and controlling.

    f) Causes of unsatisfactory project delivery

    g) Importance of effective planning and supervision


    1.4 Significance of the Study

    a) This research is deemed necessary because it provides the most economic and effective means of achieving maximum and acceptable standard for a give-project through quality management of the available resources and materials.

    b) It is to help organizations to identify and harmonize overlapping regulatory demands interdependencies that cannot be seen using spreadsheets and gives stakeholders transparency and visibility; while guaranteeing that the management process is implemented with a quality punch.

    c) The research will also provide an analytical technique for resource allocation to ensure that the project is completed within finite resource limit. And will benefit the manufacturing industries, construction and construction management oriented firms.


    1.5 Research Questions

    In other to carry out this research work effectively, the researcher is here by guided by the following questions.

    What are the elements of quality control?

    How does government policy affect quality control?

    What are project delivery constraints?

    What are the effects of not implementing quality control on any given project?


    1.6 Delimitation

    This report or research study is delimited on the general procedure of quality control in project using different quality control elements or tools to achieve efficient project delivery. The various sections from which information was elicited from contractors, professionals in building industry, clients, beneficiaries, and other stakeholders.


    1.7 Limitations

    It is obvious that research work cannot be carried out without much difficulty in the study whereby the research topic was limited to construction industry alone. Among the problems encountered were financial constraints, obtaining information from contractors whose work failed and inadequate statistical data on number of construction works that had failed in Imo State.


    1.8 Definition of Terms

    Quality: Is the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs

    Quality Characteristics: It relates to the attributes measures and methods attached to that particular product or service.

    Quality Plan: This describes the conditions that the services and materials must possess in order to satisfy the needs and expectations of the project stakeholders.

    Quality Assurance: Is a process to provide confirmation based on evidence to ensure to the client, beneficiaries, organization management and other stakeholders that product or services meet expected needs and other requirements.

    Quality Audits: These are structured reviews of the quality management activities that help identity lessons learned that can improve the performance on current or future project activities.

    Quality Control: It is the use of techniques and activities that compare actual quality performance with goals and define appropriate action in response to a shortfall.

    Quality Improvement: It is referred to the application of methods and tools to close the gap between current and expected levels of quality by understanding and addressing system deficiencies and strengths to improve, or in some cases redesign project processes.

    Cost of Quality: It is the sum of costs a project will spend to prevent poor quality and any other costs incurred as a result of outputs of poor quality.

    Poor Quality: It is the waste, errors, or failure to meet stakeholder needs and project requirements.


    CHAPTER TWO

    2.0 Literature Review

    2.1 Introduction

    This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …

    Procedure to Download the Complete Project (Seminar) Research Material

    Above is a preview excerpt of the full study on “Quality Control as an Effective Tool for Efficient Project Delivery (A Case Study of Imo State)”. The complete material, including all five chapters, is available for download upon request.


    To obtain the complete research material content, simply place an order by paying the specified project or seminar fee below, and send message containing your payment receipt to Sparklyn Services with the phone number displayed below.


    Once payment is confirmed, the complete document will be delivered via WhatsApp or email in Microsoft Word (MS-Word) format.


    Seminar Material
    ₦3,000
    Project Material
    ₦5,000

    For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.




    You can get more research topics on Building Technology, if you did not see your preferred topic from the alternate list above.

    Defense Procedure for Building Technology Researchers


    In preparation for defending a project or seminar on Quality Control as an Effective Tool for Efficient Project Delivery, it is imperative that as a nursing student, you demonstrate comprehensive knowledge of your research. The defense process is structured to include presenting your work, answering questions, and illustrating its pertinence. Initially, provide a succinct yet thorough introduction to your research topic, emphasizing its importance and the objectives, ensuring that both the audience and the External Examiner can understand the scope of your study.


    Prior to your defense, be thoroughly acquainted with your research abstract and the critical elements of Chapter One, including motivation for embarking on this research, problem statement, objectives, and significance. In Chapter Two, be ready to cite at least two references from the literature review. For Chapter Three, you should be equipped to discuss the methodologies, tools, and techniques utilized. In Chapter Four, defend your research by justifying the findings and linking them to your research objectives.


    Conclude your defense by succinctly summarizing the study and offering insightful, evidence-based recommendations. A professional dress code, such as wearing a suit and tie, is vital to create a favorable impression and elevate your presentation.


    During the question and answer segment, the External Examiner may pose questions pertaining to your research. If confronted with a challenging or irrelevant question, respond diplomatically with, “Sorry, Sir/Madam, the question asked is beyond the scope of my study.” Whenever possible, direct your answers back to your research findings to reinforce your expertise.