Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State

Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State

Project / Seminar Material
Reference ID: PS-571-TM

DEDICATION

This research material titled “Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State” is dedicated to God for his enabling grace, and to all computer enthusiasts who contributed to make life a pleasant experience during my research documentation.

ACKNOWLEDGEMENT

I extend my sincere gratitude to all those who contributed to the completion of this project. Special thanks to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Surveying and Geoinformatics, Book Authors and Profound Scholars of existing or related project material on “Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State” for their invaluable guidance, support, and expertise throughout the journey.

I am also grateful to your study area (mention any funding organizations, if applicable) for their financial assistance. This research would not have been possible without the encouragement and assistance of some stakeholders (mention any mentors, teachers, or colleagues). Additionally, I would like to acknowledge the understanding and patience of my family and friends during this endeavor. Your unwavering support has been a constant source of motivation. Thank you all for being part of this meaningful endeavor.


Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State

TABLE OF CONTENTS

PRELIMINARY PAGES


CHAPTER ONE

  • 1.1 Introduction
  • 1.2 Aim
  • 1.3 Objectives
  • 1.4 Scope of study
  • 1.5 Study area
  • 1.6 Other miscellaneous service

CHAPTER TWO

  • 2.0 Literature review

CHAPTER THREE

  • 3.0 Methodology
  • 3.1 Reconnaissance
  • 3.1.1 Office reconnaissance
  • 3.1.2 Field reconnaissance
  • 3.1.3 Data acquisition
  • 3.2 Instruments used
  • 3.3 Personnel
  • 3.4 Instrument test
  • 3.4.1 Horizontal collimation test
  • 3.4.2 Optical plumet test
  • 3.4.3 Total station EDM test
  • 3.5 Traversing
  • 3.6 Linear measurement
  • 3.7 Leveling
  • 3.8 Detailing

CHAPTER FOUR

  • 4.0 Data Analysis Processing and Presentation
  • 4.1 Preambles
  • 4.2 Linear measurement reduction
  • 4.3 Computation of co-ordinate
  • 4.4 Computation of initial bearing
  • 4.5 Computation of unadjusted co-ordinate
  • 4.6 Computation of final co-ordinate
  • 4.7 Data presentation
  • 4.8 Plotting of traverse
  • 4.8.1 Procedure for plotting of profile using land development involves the following steps
  • 4.8.2 Entity / layer creation

CHAPTER FIVE

  • 5.0 Summary, Problem encountered, Recommendations and Conclusion
  • 5.1 Summary
  • 5.2 Problem encountered
  • 5.3 Conclusion

REFERENCES

APPENDIX

ABSTRACT

This project was carried out in Emekuku ranging from Ubowala Autonomous Community in Owerri North to Umuaguru Isinkor in Ikeduru Local Government Area of Imo State, covering a distance of 4,558.065 meters (4km). The method used in carrying out the project was integrated approach which involves 3D data acquisition by the combination of traversing and trigonometric heighting using total station.

It is also carried out to acquire data for design and construction of works such as roads, railways, pipe lines, canals etc. Various instruments/tools were used to enable data capturing for the prosecution of the project in order to check met the amount of accuracy obtained. The instrument used for this project is total station kolida (KTS 44-2L), it reads in 5 seconds, it was used in carrying out traversing and cross section of the study area.

Various test such as horizontal collimation test were carried out before the commencement of the project. Temporally Benchmarks were established using hand held GPS at the starting point, change point and at the end of the 4,558.065 meters (4km) chainage. The height of all points including the beginning of curve was determined with total station and reflector as a target.

The cross-section was run with total station at every 25m interval along the line of the road. The data acquired on course of this project was used to plot the longitudinal profile of the road using Auto Card for plotting, Goecal for the computation and survey soft with a scale of 1:3500 respectively.

Ten (10) personnel were involved in the project exercise. The project write up consists of five chapters. Chapter one is introduction, chapter two shows the literature review, chapter three explains the method of data acquisition, chapter four focuses on analysis of results and chapter five states the problems encountered, summary, conclusion, recommendations, and references.


Route Survey of 4Km From Nkwoemeke to Ubowala Emekuku in Owerri North Local Government Area of Imo State

CHAPTER ONE

1.0 Introduction

A route survey is collection operation to gather information about the proposed route of a roadway, utility pipe or railway.

The details of the method of surveying to be used in a given project depends upon the topography, the nature of the project and other factors.

In this modern age, the goods system of transportation has actually become a measure of country's economic and social development. While discussing the effect of good transportation system, it may be said that the increase in productivity and efficient transportation can lower the cost of production; the transportation cost is always an influencing factors of cost of commodity.

Route survey involves activities like planning, designing and execution of survey for the location design, construction operation and maintenance of good engineering project.

Route survey is required for all phase of planning designing and construction of transportation facilities. The rehabilitation of existing road include the terrain data design, the engineer should prepare the plan with specification deferring the work to be done vividly.

Seeing the fact that state government has limited resources to carter for the survey needs of the state, the department of surveying and geoinformatics federal polytechnic Nekede Owerri sees it as a wise decision to contribute towards the national development by helping in construction of 4KM road in Emekuku Owerri north L.G.A to Umuagwu Isinkwo in Ikeduru Imo State through surveying of the road.

The data collected can a well be submitted to ministry of work as a record which could be reviewed wherever the state government wants to embark on the maintenance of this road. Subsequently, this project was allocated to a particular group in the award of higher national diploma (HND) this project was carried out using total station, measuring tape, GPS, reflector.


1.2 Aim of Study

The aim of this project is to gather relevant information of the said route by determining the longitudinal section for profile, along Umuagwuisinkwo North Local Government Areas in Imo State; keeping in view the method and technology of achieving a successful route /road construction project and the stand and of these road construction project.


1.3 Objectives of Study

  1. To analysis process and present the data in digital format.
  2. To design the formation level of the road and also the cut and fill.
  3. To provide formation (data) that are needed to show or portray the nature of terrain along the centre line of the road.
  4. To provide information needed for the construction of the route.

1.4 Scope of the Study

The scope of this covers the total distances of about 4KM. it started at Emekuku chainage 0+00 and ended at Umugwuisisnkwo it involve route surveying methods and techniques using the following operation.

  1. Traversing along the centre line of the route.
  2. Profile leveling
  3. Production of plan using Microsoft excel and survey soft and plot the following survey.
  4. Traversing
  5. Profile

1.5 Study Area

The project site is located at Emekuku in Owerri north to Umuagwuisinkwo Local government in Ikeduru Area of Imo State.

Coordinate of Emekuku

Latitude coordinate 50 28' 14”

Longitude coordinate 70 06' 13”


1.6 Other Miscellaneous Services

  1. Survey to show the final product of the construction
  2. Survey to find out what the existing condition is (preliminary survey)
  3. Survey to monitor determination of the project (post excavation survey).
  4. Survey to stakeout the processed data on the ground (location survey).

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …