📚 Departmental Project and Seminar Proposal Topics with Materials
Agricultural Economics and Extension
Civil Engineering
Computer Science (CS)
Economics
Economics Education
English Education
Food Science and Technology (FT)
Guidance and Counselling
Human Resource Management (HRM)
Linguistics and Communication
Marketing (MKT)
Mass Communication (MC)
Midwifery
Pharmaceutical Technology / Science
📚 (2023) Project / Seminar Proposal Topics and Materials

Search for Project and Seminar Topics Post Advertisement Items for Promotion
Anonymous
Design and Implementation Computerized Power Monitoring System
S

Software Implementation Computerized Power Monitoring System

C.S. Project Software
Reference ID: SD-5275-CS

Software Implementation under Computer Science (CS)

Software Implementation Computerized Power Monitoring System can be acquired by Contacting or Whatsapping Sparklyn Services Software Programmer with the number displayed below 👇

DEDICATION

This research work titled "Design and Implementation Computerized Power Monitoring System" is dedicated to God for his enabling grace and to all computer enthusiasts who help to make life a pleasant experience.



i

ACKNOWLEDGEMENT

I owe my indebtedness to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Computer Science (CS), Book Authors and Profound Scholars of existing/related research work for your moral support that facilitated the successful completion of my (Tertiary Institution level). I am grateful to God Almighty and my parent for their financial support in my career. I really appreciate you all for everything, Thank you very much.



ii


Design and Implementation Computerized Power Monitoring System

TABLE OF CONTENTS

PRELIMINARY PAGES

CHAPTER ONE

INTRODUCTION

  • 1.1 Background …

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction

CHAPTER THREE

SYSTEM ANALYSIS AND DESIGN

  • 3.1 Methodology Adopted
  • 3.1.1 Problem Identification Using SSADM
  • 3.2 Analysis of the Existing System
  • 3.2.1 Dataflow of the Existing System
  • 3.2.2 Disadvantages Of The Existing System
  • 3.2.3 Weakness of the existing System
  • 3.3 Feasibility Study
  • 3.3.1 Economic Feasibility
  • 3.3.2 Technical Feasibility
  • 3.3.3 Operational Feasibility
  • 3.4 Analysis of the Proposed System
  • 3.4.1 Data Flow Diagram of the Proposed System
  • 3.4.2 Advantages of the Proposed System
  • 3.4.3 Justification of the Proposed System
  • 3.5 Functional Requirements
  • 3.5.1 Use Case Diagram Of The Admin / User Privileges
  • 3.6 Data Requirements
  • 3.7 High Level Model of the Proposed System

CHAPTER FOUR

SYSTEM DESIGN AND IMPLEMENTATION

  • 4.1 Objectives of the Design
  • 4.2 Cohesion and Decomposition High level Model
  • 4.3 Control Center / Overall Dataflow Diagram
  • 4.3.1 Proposed System Operation Flowchart
  • 4.4 System Specification and Design
  • 4.4.1 Input and Output Specification
  • 4.4.2 Database Specification and Design
  • 4.4.3 Data Dictionary
  • 4.5 Choice and Justification of Programming Language
  • 4.6 Program Documentation
  • 4.7 Implementation Techniques
  • 4.8 Programming Module Specification
  • 4.8.1 Installation
  • 4.9 Computer Hardware Minimum Requirement
  • 4.10 Software Requirement
  • 4.11 Personnel / User Training
  • 4.12 File Maintenance Module

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion
  • 5.4 Recommendation

References

Appendix A - Source Code

Appendix B - Object Program




iii

ABSTRACT

This project research is focused on show-casing the means of monitoring the distribution of electrical power across local stations using computerized systems. It examines the concept of a computerized system and its importance in the manipulation of data to present useful and reliable information that will be used for decision-making. The research intends to find out a means of improving the operations of the PHCN, Uyo, by carrying out an analysis on the present method of operation. Also, the study created a new system to replace the old manual system of operation using the results gotten from this research. The research collected information using different research techniques such as interview method, observation method and referencing method. The research collected materials from different texts, magazines and from the Internet.





iv


Design and Implementation Computerized Power Monitoring System

CHAPTER ONE

Introduction

1.1 Background Of The Study

In a world like ours today there is every need to manage funds in every activity being carried out. It is the concern of every firm to control its finances to ensure that unnecessary expenses are avoided. Financial management in a company has proved to be a great task involving the monitor of almost all departments of the company. As such, companies tend to be severe about the tools being used to manage these resources of theirs. This is because financial resources have to do with figures, calculations and computations which may present errors if not properly handled. To this end a computerized system will go a long way to sort many issues in managing financial affairs.

Monitoring power and issuing its bill is the job of Power Holding companies, and they intend to present this information to their customers/subscribers on time and precise. In Nigeria the situation is not different. The Power Holdings Company Nigeria (PHCN) PLC has been on the job for decades now. The issue now is how is it being done and whether the method being used yields the best results? With the growing rate of technology in our world today the question is not far fetched.

The use of manual means of manipulation of records has been proved to have different flaws attached to it so companies are gradually turning on to information technology for aid. Offices are no longer known for the piles of paper and files that it usually had. Rather it is made of devices that make up an automated office system, devices like, desktops, laptops, printers, scanners, etc.

A computerized system according to Friaser, C. (2007), involves the use of computer devices and connections to achieve tasks in a corporate environment. Using this type of system to manage activities will help solve problems of familiar problems being presented by manual systems.

This research project is focused on showing how a computerized system can be modeled to monitor power outage and present bills for it. It studies the characteristics of a computerized system and its components.


1.2 Statement Of Problem

Over the years electricity monitoring in PHCN(usually known as NEPA) has been operated using manual systems and this constitute irrespective of its innate and intrinsic shortfall. When customers go to the billing sections to pay up their accrued bills, they get entrapped in long interminable queues to inefficient machines. In light of this, payment of bills turns out to be hard nut to crack for customers. On the other side of PHCN officials, it has been a tedious and cumbersome task to be abreast of the condition of electricity cables, transformers etc, and these inabilities contributes to their poor and torpid attention to critical power problems. As a matter of necessity, only an online, real-time monitoring transaction processing system can revert these plagues associated with manual procedures of power monitoring system.

The question of turning to the computerized system rather than partially automated system which serves which serves as an impediments and discomfort due to poor operating environment becomes another problem to be resolved.


1.3 Theoretical Background

The National Electric Power Authority (NEPA), which is now known as Power Holding Company of Nigeria (PHCN), was established by decree 24 of 1972 via the then electricity corporation of Nigeria and the Niger Dan Authority (NDA). It was accorded the mandate to generate, transmit, distribute, and market electricity.

It has on its own the task to develop and to maintain an efficient coordinated and economical system of electricity supply to all parts of Nigeria and other parts of West Africa like Benin republic, Ghana and Niger republics in the northern part of Nigeria. In the bid to meet with its statutory responsibility geared towards the satisfaction of its customers need worldwide constitute the establishment of the Alausa-Ikeja road office, which has been functional over decades.

Past, the system was not well efficient because the manipulations of the system were handled solely using humans’ operations which constituted different errors. In our time, it has become necessary to implement modern approaches to technology in order to manage activities of an organization.


1.4 Objectives of the Study

The objective of this study is to show how a computerized system can be built for the PHCN Uyo, to aid the handle of electricity monitoring and bill presentation for customers. The study examines the distinction between a manual and computerized system, and intends to settle the problems created by manual systems by modeled automated systems.

To employ Information Technology (IT) potentials in customers service and the organization as a whole, as well as to ascertain whether computerized system is of positive impact to the general service structure or a threat to the staff’s job security.


1.5 Significance of the Study

Owing to the apparent and deliberate cynic approach of people towards the issue of whether or power monitoring system is expedient, the research project has the under-listed significance:

  1. Eliminates the problems inherent in the old power monitoring system/procedure by offering an automated real-time data processing approach.
  2. Reduce complaints by aggrieved customers owing to poor service thereby upholding the corporate image of PHCN.
  3. Educate PHCN officials of the use of computing operations to carry out transactions.
  4. To ginger further study and research on the topic by other students and academicians.

1.6 Scope of the Study

The scope of this study is focused on power monitoring in PHCN. It considers the procedures used for managing the billing system in PHCN and how a computerized system can contribute to the betterment of these activities. The study uses Power Holding Company of Nigeria (PHCN), Uyo as its case study.


1.7 Definition of Terms

Electric Power:

Electric power is the rate of energy consumption in a circuit. The electric power is measured in units of watts.

Capacitor:

This is a passive two-terminal component used to store energy in an electric field.

Monitoring:

This generally means to be aware of the state of the system in order to control the system effectively.

Bills:

This is an amount of money owed for goods supplied or services rendered, set out in a printed or written statement of charge that is to be paid for at a later date by the consumers.

Voltage:

This is the potential energy that makes the electrical current flow in circuit by pushing the electrons around. It is how we measure the difference in electrical energy.

Supply:

This is the amount of electrical energy that is being released to a particular circuit within a particular. Supply determines the consumption of power.

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Complete Material Chapters of Design and Implementation Computerized Power Monitoring System

Order Complete Material with Preferred Acquisition Method

Design and Implementation Computerized Power Monitoring System Complete Material can be acquired by placing an order for the material which will be sent in Microsoft Word (MS-Word) Format and the cost of acquisition is ₦3,000.

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


METHOD #1

Request Complete Material

Complete Material Chapters of Design and Implementation Computerized Power Monitoring SystemClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages, Chapter 1-5, References, and Appendix.


METHOD #2

Account Details - For USSD / POS Transfer

Details


Account Name: Sparklyn Services
Account No: 1222599051
Account Type: Current
Bank Name: Zenith Bank PLC

After transaction, kindly inform Us with the contact details above.


METHOD #3

Sparklyn Services, duly registered with the Corporate Affairs Commission (CAC) under the Federal Law with RC: 2994849 operates on Secure Sockets Layer (SSL), therefore all transactions on this site is secured and safe!

Order Complete Material with Card
Full Name
Phone Number
Email Address
Research Topic

Secured by Paystack

Disclaimer for Computer Science (CS) Research Material

The displayed research work titled "Design and Implementation Computerized Power Monitoring System" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as Sparklyn Services (sparklyn.com.ng) will not be liable for any who copied the material.
By ordering the complete research guideline, it signifies that you've accepted our terms of service.

Proposal Writing Format for Computer Science (CS) Research Work

Final year research work is all about finding real life problem and proffering solution that will partially or totally eliminate the existing system bottlenecks. The following are the major and elective project proposal writing sections for "Design and implementation computerized power monitoring system" research work;

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)



Didn't find your Preferred Topic? Perform an Instant Topic Search

Your preferred topic wasn't listed? Click here to view more Computer Science proposal topics

Proposal Writing Format under Computer Science


Design and Implementation Computerized Power Monitoring System is a proposal topic for final year research work, which comprises the major and elective project proposal writing sections for Design and Implementation Computerized Power Monitoring System research work.

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)


Defense Procedure for Computer Science Researchers


Know your Project / Seminar Work (Design and Implementation Computerized Power Monitoring System): Here are the key point to study if your work is cumbersome or not.

  • Abstract

CHAPTER ONE

  • Motivation / Statement of Problems
  • Aims & Objective of Study
  • Scope of Study
  • Significance of Study

CHAPTER TWO

  • State two or more citation from your review of related literature.

CHAPTER THREE

  • Know the methodologies, tools and techniques used.

CHAPTER FOUR

  • Justification of your work and things to adhered to before using the system or research work.

CHAPTER FIVE

  • Conclusion and Recommendation

Dress Code: Your dress code should be cooperate wear for example; putting on suit and tie during project defense gives you an automatic mark without a word.

External Examiner / Supervisor Questioning & Student Answering: Questions will come from the research work, any difficult or unknown question, kindly say "Sorry Sir/Madam, the question is not within my scope of study".