📚 Departmental Project and Seminar Proposal Topics with Materials
Banking and Finance (BF)
Business Administration and Management (BAM)
Civil Engineering
Computer Engineering
Electrical Electronics Engineering (EEE)
English Education
English Language
Estate Management (EM)
Human Resource Management (HRM)
Library and Information Science (LIS)
Linguistics and Communication
Maritime and Transport
Marketing (MKT)
Mechanical Engineering
Midwifery
Nursing (Science)
Office Technology and Management (OTM)
Pharmaceutical Technology / Science
Physical and Health Education
Primary Education
Public Administration (PA)
Public Health
📚 Departmental Project and Seminar Proposal Topics with Materials
Purchasing and Supply (PS)
Quantity Surveying (QS)
Science Education
Science Laboratory Technology (SLT)
Surveying and Geoinformatics
Tourism and Hospitality Management
Transport Management Technology
Vocational Education
Entrepreneurial Skills
👗 Ankara Craft
📿 Bead Making
🎂 Cake Making
📹 CCTV Installation
🧀 Chin-Chin Making
🛫 China Goods Importation
🍩 Doughnut Making
🎋 Hair Braiding Tutorial
🍪 How to Make Eggrolls
🥜 How to Make Peanuts
🎀 How to tie Gele
👄 Make-Up Guide
🥠 Meat-Pie Making
🎨 Paint Making
🕸 Pom-Pom Rug Making
🍵 Soap Making
💼 More Entrepreneurial Skill


R Unknown
Chat
Compose Post Website URL Search Ad. Post Advert
Anonymous
Design of an Artificial Lift System for Well J50 Production Optimization
S

Software Implementation for Project Software of an Artificial Lift System for Well J-50 Production Optimization

C.S. Project Software
Reference ID: PS-5137-TM

Software Implementation under Computer Science (CS)

Software Implementation for Project Software of an Artificial Lift System for Well J-50 Production Optimization can be acquired by Contacting or Whatsapping Sparklyn Services Software Programmer with the number displayed below 👇

DEDICATION

This research work titled "Design of an Artificial Lift System for Well J-50 Production Optimization" is dedicated to God for his enabling grace and to all computer enthusiasts who help to make life a pleasant experience.



i

ACKNOWLEDGEMENT

I owe my indebtedness to my Supervisor (Name of your Supervisor), the Head of Department (Name of your HOD), the Lecturers in the department of Computer Science (CS), Book Authors and Profound Scholars of existing/related research work for your moral support that facilitated the successful completion of my (Tertiary Institution level). I am grateful to God Almighty and my parent for their financial support in my career. I really appreciate you all for everything, Thank you very much.



ii


Design of an Artificial Lift System for Well J-50 Production Optimization

TABLE OF CONTENTS

Preliminary Pages

Chapter One

Introduction

  • 1.1 Background …

Chapter Two

Literature Review

  • 2.1 Introduction

Chapter Three

System Analysis and Design

  • 3.1 Methodology Adopted
  • 3.1.1 Problem Identification Using SSADM
  • 3.2 Analysis of the Existing System
  • 3.2.1 Dataflow of the Existing System
  • 3.2.2 Disadvantages Of The Existing System
  • 3.2.3 Weakness of the existing System
  • 3.3 Feasibility Study
  • 3.3.1 Economic Feasibility
  • 3.3.2 Technical Feasibility
  • 3.3.3 Operational Feasibility
  • 3.4 Analysis of the Proposed System
  • 3.4.1 Data Flow Diagram of the Proposed System
  • 3.4.2 Advantages of the Proposed System
  • 3.4.3 Justification of the Proposed System
  • 3.5 Functional Requirements
  • 3.5.1 Use Case Diagram Of The Admin / User Privileges
  • 3.6 Data Requirements
  • 3.7 High Level Model of the Proposed System

Chapter Four

System Design and Implementation

  • 4.1 Objectives of the Design
  • 4.2 Cohesion and Decomposition High level Model
  • 4.3 Control Center / Overall Dataflow Diagram
  • 4.3.1 Proposed System Operation Flowchart
  • 4.4 System Specification and Design
  • 4.4.1 Input and Output Specification
  • 4.4.2 Database Specification and Design
  • 4.4.3 Data Dictionary
  • 4.5 Choice and Justification of Programming Language
  • 4.6 Program Documentation
  • 4.7 Implementation Techniques
  • 4.8 Programming Module Specification
  • 4.8.1 Installation
  • 4.9 Computer Hardware Minimum Requirement
  • 4.10 Software Requirement
  • 4.11 Personnel / User Training

Chapter Five

Summary, Conclusion, and Recommendation

  • 5.1 Introduction
  • 5.2 Summary
  • 5.3 Conclusion
  • 5.4 Recommendation

References

Appendix A - Source Code

Appendix B - Object Program




iii


Design of an Artificial Lift System for Well J-50 Production Optimization

CHAPTER ONE

Introduction

1.1 Background of Study

Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy Information Administration) stated that the world consumption of crude oil daily is 85.64 million barrels, which is equivalent to 2 liters of oil per day per person.

Generally, oil can be produced from the reservoir by the stored energy of the oil in the reservoir. This energy is obtained by the difference between the reservoir and wellbore pressures. If this difference is high, the well will be capable of producing naturally. Most oil wells worldwide produce naturally in their early lives until there is a decrease in the reservoir pressure which leads us to enhanced oil recovery.

When a well has been producing for a period of time, there will be decrease in reservoir pressure and as a result the difference between reservoir and wellbore pressure will decline. So, the energy in the well will not be able to lift oil up to surface, or it might lift oil to the surface but in less than economic volume. At this stage, artificial lift is introduced and it can be utilized to overcome this issue by reducing the wellbore pressure. This reduction will bring back the essential difference between the reservoir and wellbore pressure so oil can be extracted and lifted up to the surface.

One of the most important roles of artificial lift is to maximize the production rate from flowing wells. Artificial lift can be divided into two types, based on lifting mechanism: gas lifting and pumps. The gas lifting method makes use of a compressed gas that is injected from the surface to certain points in the tubing. This gas will lower the density of the fluid column in the tubing causing a reduction in the wellbore pressure and therefore increasing production. The pumping method, on the other hand, involves setting the pump at a certain depth inside the tubing that will cause it to be submerged below the liquid level. This pump will lower the wellbore pressure and hence increase the drawdown, thereby boosting production. The most common artificial lift methods used are as follows:

  1. Electrical Submersible Pump (ESP)
  2. Sucker Rod Pumps (SRP)
  3. GasLift (GL)
  4. Plunger Lift Pumps (PLNG)
  5. Progressive Cavity Pumps (PCP)
  6. Hydraulic Pumps (HP)

Bearden (2007), stated that ESP is the most competent and consistent method of artificial lift when moderate to high volume of oil needs to be lifted from the well. He also estimated the lifting capacity of ESPs to be as low as 150 barrels per day and as high as 150,000 barrels per day. Fig 1.1 below shows the various types of artificial lifts and their utilization worldwide.

Fig 1.1 Artificial lift types and their utilization.

1.2 Statement of Problem

A major challenge faced in lifting oil and gas from the reservoir through the production tubing to the surface facilities is an unnecessary production decline which is as a result of low reservoir pressure and it is a serious problem in the petroleum industry today. This decline may be as a result of mismanagement of wells, excessive pressure drops along the production system, oversized or undersized tubing, and improper perforation method etc. A change in any component of the production system may lead to a change in the pressure drop behavior of the other components since the various components are interactive.

This study shows the design of an ESP artificial lift system and production optimization of Well J-50 is a new horizontal well in a Niger Delta field. In other to optimize production and produce about 10,000bopd as the desired rate of production, ESP was recommended to be designed for the well to achieve optimum production by.

1.3 Methodology

The method to be used for this work is the analytical method of ESP design and using the software PROSPER. In the analytical method the following steps will be taken to design the ESP design;

  1. Collection of basic data
  2. Calculation of production capacity
  3. Gas calculations
  4. Determination of Total Dynamic Head (TDH)
  5. Pump-type selection and calculation of pump stages
  6. Optimum size of components
  7. Electric cable selection

In using PROSPER (Production System Performance Analysis Software) to design the ESP system the following steps will be followed;

  1. Using existing PVT and VLP data has a basis of new analysis.
  2. Calculating pump intake and outlet pressures.
  3. Designing an ESP system
  4. Evaluating pump operating point sensitivities.
  5. Calculate a flowing gradient for an ESP equipped well.

1.4 Aim and Objectives

The major aim of carrying out this research is to optimize production for well J-50 by designing an artificial lift system while its objectives are as follows;

  1. To design an artificial lift system (ESP) for a well that the production rate has declined.
  2. To boost production for a producing well and increase revenue.
  3. To describe and design an operation of ESP for a given well.

1.5 Significance of study.

The significance of this study in the petroleum industry is to show the importance of designing ESP for a new well and also the use of artificial lift in maximizing oil production.

1.6 Scope and limitations of Research

The scope of this research is limited to the use of manual method and PROSPER in designing an ESP for artificial lift so as to optimize production. There are other softwares that can also be used in designing an ESP System but for this project PROSPER is used due to availability. The study is conducted in a Niger Delta reservoir and a suitable ESP design will be done to increase the well production potential.

CHAPTER TWO

2.0 Literature Review

2.1 Introduction

This chapter focuses on the review of related literature. A literature review includes the current knowledge as well as theoretical and methodological contributions to a particular topic. It documents the state of the art with respect to the topic you are writing. It surveys the literature in the topic selected. In this research work the literature review includes the …

Complete Material Chapters of Design of an Artificial Lift System for Well J50 Production Optimization

Order Complete Material with Preferred Acquisition Method

Design of an Artificial Lift System for Well J-50 Production Optimization Complete Material can be acquired by placing an order for the material which will be sent in Microsoft Word (MS-Word) Format and the cost of acquisition is ₦3,000.

For Mobile Money (MoMo) and Researchers Outside Nigeria, Kindly Request Complete Material via WhatsApp.


METHOD #1

Request Complete Material

Complete Material Chapters of Design of an Artificial Lift System for Well J50 Production OptimizationClick here to request the Complete Material via WhatsApp including;
  • Preliminary Pages, Chapter 1-5, References, and Appendix.


METHOD #2

Account Details - For USSD / POS Transfer

Details


Account Name: Sparklyn Services
Account No: 1222599051
Account Type: Current
Bank Name: Zenith Bank PLC

After transaction, kindly inform Us with the contact details above.


METHOD #3

Sparklyn Services, duly registered with the Corporate Affairs Commission (CAC) under the Federal Law with RC: 2994849 operates on Secure Sockets Layer (SSL), therefore all transactions on this site is secured and safe!

Order Complete Material with Card
Full Name
Phone Number
Email Address
Research Topic

Secured by Paystack

Disclaimer for Computer Science (CS) Research Material

The displayed research work titled "Design of an Artificial Lift System for Well J-50 Production Optimization" is stated as a research guideline towards accomplishing your assigned project / seminar research work. All the research materials on this website are ONLY for research purposes and should be used as a guideline in developing your research work. For no reason should you copy word for word as Sparklyn Services (sparklyn.com.ng) will not be liable for any who copied the material.
By ordering the complete research guideline, it signifies that you've accepted our terms of service.

Proposal Writing Format for Computer Science (CS) Research Work

Final year research work is all about finding real life problem and proffering solution that will partially or totally eliminate the existing system bottlenecks. The following are the major and elective project proposal writing sections for "Design of an artificial lift system for well j-50 production optimization" research work;

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)



Didn't find your Preferred Topic? Perform an Instant Topic Search

Your preferred topic wasn't listed? Click here to view more Computer Science proposal topics

Proposal Writing Format for Computer Science Research Work


Design of an Artificial Lift System for Well J-50 Production Optimization is a proposal topic for final year research work, which comprises the major and elective project proposal writing sections for Design of an Artificial Lift System for Well J-50 Production Optimization research work.

Major Sections
  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections
  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)


Defense Procedure for Computer Science Researchers


Know your Project / Seminar Work (Design of an Artificial Lift System for Well J-50 Production Optimization): Here are the key point to study if your work is cumbersome or not.

  • Abstract

CHAPTER ONE

  • Motivation / Statement of Problems
  • Aims & Objective of Study
  • Scope of Study
  • Significance of Study

CHAPTER TWO

  • State two or more citation from your review of related literature.

CHAPTER THREE

  • Know the methodologies, tools and techniques used.

CHAPTER FOUR

  • Justification of your work and things to adhered to before using the system or research work.

CHAPTER FIVE

  • Conclusion and Recommendation

Dress Code: Your dress code should be cooperate wear for example; putting on suit and tie during project defense gives you an automatic mark without a word.

External Examiner / Supervisor Questioning & Student Answering: Questions will come from the research work, any difficult or unknown question, kindly say "Sorry Sir/Madam, the question is not within my scope of study".


Summary Headlines for Design of an Artificial Lift System for Well J-50 Production Optimization




    NEED HELP? CALL US 24/7:
    +234 803 051 1988