× Close

📚 Departmental Topics and Materials for (2024) Google Researchers
Adult Education Topics
Architecture Topics
Banking and Finance Topics
Building Technology Topics
Civil Engineering Topics
📚 Project or Seminar Related (2024) Scholaristic Topics for Students

Search for Project and Seminar Topics Post Advertisement Items for Promotion
Anonymous
Software Implementation for Computer Based Queuing System Simulation A Case Study of Imo State Transport Company ITC Owerri

Software Implementation for Computer Based Queuing System Simulation (A Case Study of Imo State Transport Company ITC Owerri)

C.S. Project Software
Reference ID: SD-5023-CS

Software Implementation under Computer Science (CS)

Every Computer Science (CS) Student embarking on the research work titled “Computer Based Queuing System Simulation (A Case Study of Imo State Transport Company ITC Owerri)” is expected to designate a software for the research proposed system that will totally or partially eradicate the drawbacks of the existing system.


The research proposed system can be acquired by informing Sparklyn Services Software Developer (Programmer) with the contact details displayed below. 🔰



Request Material Software

Complete Material Chapters of Computer Based Queuing System Simulation A Case Study of Imo State Transport Company ITC OwerriClick here to request the Material Software via WhatsApp including;
  • Local Server, Programming languages and Software Tutorial.



Computer Science (CS) Research Proposal Guideline

Final year research work is all about finding real life problem and proffering solution that will partially or totally eliminate the existing system bottlenecks. The following are the major and elective project proposal writing sections for "Computer based queuing system simulation (a case study of imo state transport company itc owerri)" research work;

Major Sections

  • Motivation for Embarking on the Project

  • Brief Background of Study

  • Statement of Problems

  • Aim of the Study

  • Specific Objectives of the Study

  • Significance of the Study (Who benefits from the project and how?)

Elective Sections

  • Methodology and Reason for Using It (such as; models, SSADM, or OOADM)

  • Tools (programming languages and software used)