Project Topics Seminar Topics School of Nursing Exam PDF Sign Up
Search Topic
PARKLYN
ERVICES
· RC: 2994849
Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings (A Case Study of University of Ilorin Lecture Hall, Kwara State, Nigeria)
WhatsApp Channel

Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings


This page presents an excerpt of the research material, providing a comprehensive overview of the study. It includes the Preliminary Pages, Table of Contents, Abstract, Chapters One to Five, and References, making it accessible and informative for students, researchers, and other readers interested in the topic of this study. Acknowledgement is also included, expressing gratitude to the individuals, institutions, and resources that contributed to the successful completion of the research, with materials and information sourced from the online platform sparklyn.com.ng, which provided valuable academic support.



Material Excerpt on Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings


PRELIMINARY PAGES

  • Title page
  • Approval page
  • Dedication
  • Acknowledgement
  • Table of Contents
  • Abstract

CHAPTER ONE

INTRODUCTION

  • 1.1 Introduction
  • 1.2 Background of Study
  • 1.3 Statement of the Problem
  • 1.4 Aim and Objective of the Study
  • 1.5 Research Questions
  • 1.6 Research Hypothesis
  • 1.7 Significance of Study
  • 1.8 Scope of Study
  • 1.9 Limitations of the Study
  • 1.10 Operational Definition of Terms

CHAPTER TWO

LITERATURE REVIEW

  • 2.1 Introduction
  • 2.2 Conceptual Review
  • 2.3 Theoretical Framework
  • 2.4 Empirical Studies
  • 2.5 Research Gaps
  • 2.6 Summary of Literature Review

CHAPTER THREE

RESEARCH METHODOLOGY

  • 3.1 Introduction
  • 3.2 Research Design
  • 3.3 Population of Study
  • 3.4 Sampling and Sampling Technique
  • 3.5 Validation of Research Instrument
  • 3.6 Method of Data Collection
  • 3.7 Method of Data Analysis
  • 3.8 Questionnaire Administration
  • 3.9 Ethical Consideration
  • 3.10 Statistical Analysis

CHAPTER FOUR

DATA ANALYSIS, RESULT AND DISCUSSION

  • 4.1 Introduction
  • 4.2 Presentation and Analysis of Data
  • 4.3 Re-statement of Research Questions
  • 4.4 Test of Hypotheses
  • 4.5 Discussion of Findings

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATION

  • 5.1 Introduction
  • 5.2 Summary of Findings
  • 5.3 Conclusion
  • 5.4 Recommendation
  • 5.5 Suggestion for Further Study

REFERENCES

APPENDIX A - “QUESTIONNAIRE”



1.1 Introduction

In this section, Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings is discussed, with relevant and recent citations. As a prelude to other parts of this study, this chapter will discuss the background upon which this study was initiated, the statement of problems that led to this study, the aim and objectives of the study. Others are significance of the study, scope of work, research hypothesis and questions, limitation of the study and definition of terms.


CHAPTER TWO

LITERATURE REVIEW


2.1 Introduction

This chapter focuses on the review of related literature. A literature review presents current knowledge, as well as theoretical and methodological contributions, related to Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings. It documents the state of the art on the subject under study and provides a comprehensive survey of existing literature. In this research work the literature review includes the conceputal review, theoretical framework, the review of related literature …


How to Download the Complete PDF Material (Table of Contents, Abstract, Chapter 1-5, and References)


Above is a preview excerpt of the full study on “Review of Construction Delay Factors and Cost Impact in Higher Institution Buildings (A Case Study of University of Ilorin Lecture Hall, Kwara State, Nigeria)”. The complete material, including all five chapters, is available for download upon request. Get in touch with us here!